Laserfiche WebLink
lairammoirmazaractinm <br />Table 3 - Implementation Plan <br />N <br />_ <br />d <br />E <br />O <br />0 <br />Immediate pedestrian safety improvements targeting key deficiencies I Temporary (throw <br />away) <br />Continuous local connection from Thurston to Main on N side of TH 10 I Dependent upon ROW <br />acquisition <br />Significant safety and mobility improvements on WB Hwy 10 I Provide pedestrian <br />accommodations prior to Fair Oak signal removal <br />Continuous local connection from Sunfish to Thurston on N side of TH 10 I Closes 11 access <br />points on TH 10 <br />Continuous local connection from Ramsey to Sunfish on N side of TH 10 I Closes 26 access <br />points on TH 10 <br />Continuous local connection from Armstrong to Ramsey Blvd on S side of TH 10 I Closes 1 <br />3-1-1 South Frontage Rd extension from Traprock St to Ramsey Blvd MA / LOCAL / MSAS / PRIV $300,000 $0 $800,000 $1,100,000 <br />access point on TH 10 <br />Subtotal $29.6 M <br />�+ <br />V O <br />C <br />O <br />V <br />i <br />N <br />SN <br />0 <br />� <br />R <br />itLV <br />O <br />O 7 <br />U <br />Q <br />TH / MA $0 $0 $390,000 $390,000 <br />MA / TIF / LOCAL / MSAS $2,200,000 $100,000 $2,700,000 $5,000,000 <br />TAP / TH / HSIP / COC / CIMS / $800,000 $0 $8,800,000 $9,600,000 <br />CMAQ / LOCAL / MA / MSAS <br />MA / LOCAL / MSAS / RALF $800,000 $900,000 $1,300,000 $3,000,000 <br />MA / LOCAL / RALF / MSAS / TH / <br />CIMS $1,900,000 $3,000,000 $6,700,000 $11,600,000 <br />as <br />_ <br />1 <br />_ <br />T. <br />d <br />0 <br />d <br />Subarea 5 Short term pedestrian improvements I Median barrier with fence I Select trail connections (Verndale to <br />Fairoak - north side and Fairoak to Main - south side) <br />Construct Greenhaven Pkwy from Thurston Ave to Main St I New intersection on Thurston Ave (signal or <br />5-1-1 <br />roundabout) I Remove all -way stop on Thurston Ave <br />Reduced conflict intersection at Fairoak Ave I Frontage Road from Cutters Grove to Fairoak Ave I <br />5-1-2a <br />Pedestrian overpass near Verndale Avenue <br />4-1-2E North Frontage Rd from Sunfish Lake Blvd to Anoka Tech <br />3-1-4 Realign TH 10 between Ramsey Blvd and Sunfish Lake Blvd I Construct North Frontage Rd <br />4-1-2W <br />V <br />d <br />.O <br />a <br />MA / LOCAL / MSAS / PRIV / TH <br />$16M - $26.2M <br />$20.9 - $31.1 M <br />w <br />$11.4M - $23.9M <br />$0 or $23M - $26M <br />a a <br />V U <br />\ J <br />2 m <br />O � <br />C W <br />V <br />NC <br />2 <br />J g,L2 <br />a Q <br />O W <br />V H <br />Full grade separation conversion at Thurston Ave (if not completed previously) <br />M <br />f0 <br />01 <br />f0 <br />to <br />waa;-p <br />0 <br />0 <br />0 <br />0 <br />0 <br />lD <br />V V <br />0 0 <br />0 0 <br />0 0 <br />� r•I <br />r-I r-I <br />c <br />O <br />v <br />V <br />T <br />T <br />O1 <br />01 <br />O1 <br />fll <br />U1 <br />f0 <br />fC <br />f6 <br />E <br />E <br />E <br />O <br />CQ <br />E <br />c <br />O <br />0 <br />0 <br />O <br />e-I <br />C <br />O <br />O O p <br />O O O G O <br />00o rn ooa <br />m <br />a <br />Veterans Dr extension to Ramsey Blvd <br />Subarea 3 RR Underpass - Ramsey Boulevard <br />MA / LOCAL / PRIV <br />156th St extension Jarvis St to Alpine St <br />MA / LOCAL / PRIV <br />HSIP / MA/ LOCAL / TH / MSAS <br />HSIP / MA/ LOCAL / TH / MSAS <br />MA/ LOCAL / PRIV / TED <br />South Frontage Rd extension Edison St to Adams St <br />RCUT at Alpine Dr with turn lane improvements and South Frontage Rd to Alpine Dr <br />RCUT at Bowers Dr with turn lane improvements <br />ale Blvd extension to Bowers Dr <br />uen!aa A;e;es / ;uewdolanaa / /(;tun;aoddp <br />u. <br />F <br />N u. <br />J <br />m tL <br />Gi V G7 t� G7 i J <br />LO <br />HIGHWAY 10 ACCESS PLANNING STUDY <br />