My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Council - 04/27/2021
Ramsey
>
Public
>
Minutes
>
Council
>
2021
>
Minutes - Council - 04/27/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:02:19 AM
Creation date
6/18/2021 1:54:23 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Council
Document Date
04/27/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Councilmember Heineman asked how often City vehicles or emergency vehicles have to back out <br />of that street. <br /> <br />City Engineer Westby replied that he does not have the number. He stated that during snow events, <br />the plows make sure to plow far enough to provide access to all the driveways, which pushes snow <br />past the gravel area and then backup and turn around using Radium Street. <br /> <br />Mayor Kuzma commented that it is difficult to see behind when backing up a snowplow and <br />therefore safety is a concern. <br /> <br />Councilmember Woestehoff asked if this process would remove the gravel and add a bituminous <br />bib to the end property. He commented that would seem to be a benefit as that seems to be a well- <br />used access. <br /> <br />City Engineer Westby confirmed that the bib and bituminous driveway would be part of the <br />project. <br /> <br />Councilmember Musgrove commented that there were a few recommendations to complete a two- <br />or 2.5-inch mill and overlay and asked if that would be done in lieu of a full replacement in some <br />areas. <br /> <br />City Engineer Westby replied that he believed there were three boring locations where a mill and <br />overlay could be completed. He stated that there is a benefit to completing the reconstruction on <br />all the areas within the project at the same time as the bids will be better for one fluid project rather <br />than bidding different segments. He stated that would require more time and coordination and <br />would typically increase the cost as well. He stated that this method also places the entire area on <br />the same maintenance schedule rather than having different segments within an area on different <br />schedules. <br /> <br />Motion by Councilmember Musgrove, seconded by Councilmember Woestehoff, to Adopt <br />Resolution #21-106 Accepting Bids and Awarding Contract for Business Park 95 Street <br />Reconstruction, Improvement Project #21-03. <br /> <br />A roll call vote was performed: <br /> <br />Councilmember Heineman aye <br />Councilmember Woestehoff aye <br />Councilmember Specht aye <br />Councilmember Musgrove aye <br />Councilmember Howell aye <br />Councilmember Riley aye <br />Mayor Kuzma aye <br /> <br />Motion carried. <br />City Council / April 27, 2021 <br />Page 7 of 17 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.