My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/08/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 06/08/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:00:32 PM
Creation date
6/21/2021 9:50:54 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/08/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session <br />Meeting Date: 06/08/2021 <br />Submitted For: Bruce Westby, Engineering/Public Works <br />By: Joe Feriancek, Engineering/Public Works <br />Information <br />7.3. <br />Title: <br />Adopt Resolution #21-159 Ordering Plans and Specifications for Improvement Project # 21-12, 2021 Additional <br />Pavement Overlay Improvements <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #21-159 Ordering Plans and Specifications for Improvement Project <br />#21-12; 2021 Additional Pavement Overlay Improvements. <br />Background: <br />The 2021 — 2030 Capital Improvement Program (CIP) included an estimated $1,878,700 in 2021 Pavement <br />Management Program (PMP) projects, which include street reconstruction and pavement overlay improvements. <br />These projects were proposed to be funded through the Pavement Management (PM) fund. After the City Council <br />accepted bids and awarded contracts for all 2021 PMP projects included in the 2021 — 2030 CIP, a total of <br />$1,313,831.08 is anticipated to be spent from PM funds. This means $564,868.92 of PM funds that were designated <br />for 2021 PMP projects will remain unspent. <br />In past years, the City Council has directed Staff to fully utilized funds annually budgeted for necessary PMP <br />projects. Staff therefore proposes to expend an additional estimated $672,000 on needed pavement overlay <br />improvements in 2021 to ensure that all PM funds designated for 2021 PMP projects will be spent in 2021. Staff, <br />therefore, proposes to overlay an additional 2.58 miles of streets segments in 2021 that are proposed as 2022 <br />pavement overlay improvements in the 2021 — 2030 CIP. These street segments, which are shown on the attached <br />project map and are further outlined in the attached street segment summary, were specifically selected since they <br />are exhibiting pavement stripping issues. This will allow the City to address stripping concerns on these streets one <br />year sooner than anticipated in the current CIP, reducing potential impacts to the underlying pavement structure and <br />maximizing the favorable bidding environment. <br />Street segments proposed to receive additional bituminous pavement overlay improvements in 2021 are located in <br />the following developments: <br />• Reilley Estates <br />• Reilley Estates 2nd <br />• Reilley Estates 3rd <br />• Sunfish Gateway Business Park <br />• Traprock Commons <br />• Wildlife Sanctuary 2nd <br />• Wildlife Sanctuary 3rd <br />The proposed improvements are designated as City Improvement Project #21-12, 2021 Additional Pavement <br />Overlay Improvements. <br />Notification: <br />No notifications are required with this case. <br />
The URL can be used to link to this page
Your browser does not support the video tag.