Laserfiche WebLink
CC Regular Session <br />Meeting Date: 06/08/2021 <br />Submitted For: Bruce Westby, Engineering/Public Works <br />By: Joe Feriancek, Engineering/Public Works <br />Information <br />7.3. <br />Title: <br />Adopt Resolution #21-159 Ordering Plans and Specifications for Improvement Project # 21-12, 2021 Additional <br />Pavement Overlay Improvements <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #21-159 Ordering Plans and Specifications for Improvement Project <br />#21-12; 2021 Additional Pavement Overlay Improvements. <br />Background: <br />The 2021 — 2030 Capital Improvement Program (CIP) included an estimated $1,878,700 in 2021 Pavement <br />Management Program (PMP) projects, which include street reconstruction and pavement overlay improvements. <br />These projects were proposed to be funded through the Pavement Management (PM) fund. After the City Council <br />accepted bids and awarded contracts for all 2021 PMP projects included in the 2021 — 2030 CIP, a total of <br />$1,313,831.08 is anticipated to be spent from PM funds. This means $564,868.92 of PM funds that were designated <br />for 2021 PMP projects will remain unspent. <br />In past years, the City Council has directed Staff to fully utilized funds annually budgeted for necessary PMP <br />projects. Staff therefore proposes to expend an additional estimated $672,000 on needed pavement overlay <br />improvements in 2021 to ensure that all PM funds designated for 2021 PMP projects will be spent in 2021. Staff, <br />therefore, proposes to overlay an additional 2.58 miles of streets segments in 2021 that are proposed as 2022 <br />pavement overlay improvements in the 2021 — 2030 CIP. These street segments, which are shown on the attached <br />project map and are further outlined in the attached street segment summary, were specifically selected since they <br />are exhibiting pavement stripping issues. This will allow the City to address stripping concerns on these streets one <br />year sooner than anticipated in the current CIP, reducing potential impacts to the underlying pavement structure and <br />maximizing the favorable bidding environment. <br />Street segments proposed to receive additional bituminous pavement overlay improvements in 2021 are located in <br />the following developments: <br />• Reilley Estates <br />• Reilley Estates 2nd <br />• Reilley Estates 3rd <br />• Sunfish Gateway Business Park <br />• Traprock Commons <br />• Wildlife Sanctuary 2nd <br />• Wildlife Sanctuary 3rd <br />The proposed improvements are designated as City Improvement Project #21-12, 2021 Additional Pavement <br />Overlay Improvements. <br />Notification: <br />No notifications are required with this case. <br />