Laserfiche WebLink
Summary <br />The project will impact 889.66 sqft of trees due to primary and secondary construction. The <br />projected tree BA within Tree Area 1 (17.25 ac) was calculated at 3174 sqft and 616.78 sqft in <br />Tree Area 2 (5.17 ac). The total tree coverage within the woodland totals 3790.78 sqft. These <br />methods show that the proposed project will impact 23.47% of the total trees BA onsite and the <br />project does not require a tree replacement plan. <br />If you have any questions regarding this project, or need additional information, please do not <br />hesitate to call me at 952-401-8757 Ext. 4. <br />Thank you, <br />Kyle Uhler <br />Kjolhaug Environmental Services Company <br />