My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 07/22/2021
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2021
>
Agenda - Planning Commission - 07/22/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:08:57 AM
Creation date
7/16/2021 11:35:35 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
07/22/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Density). A Zoning Amendment would be required to rezone the northwest portion of the Subject Property to R-1 <br />Residential (MUSA) - 65 and the remainder to R-2 Residential (Medium Density). Density transitioning will be <br />required between new lots and existing residential lots. <br />Streets and Access <br />As proposed, there is only a single point of access, which would be off Armstrong Boulevard (directly across from <br />149th Lane). The length of the proposed cul-de-sac is about 2,100 feet, which exceeds the 600 foot maximum <br />outlined in City Code. Staff has recommended that an alternative layout be developed so that the cul-de-sac length <br />does not exceed 600 feet and that a second point of access be incorporated. Potential options could include <br />acquiring some or all of the parcel to the north of the Subject Property and the Fire Station, if that owner were <br />interested, or possibly along the southern edge of the Fire Station. The City would like to see the site to the north <br />incorporated into the site plan, at a minimum as a ghost plat, to allow a future road connection to the existing <br />cul-de-sac on 151st Ln NW. <br />Sidewalks and Trail <br />Sidewalks will be required along at least one (1) side of every public road. Furthermore, the southwestern part of <br />the Subject Property is part of the Lake Itasca Greenway. Thus, a trail (or possibly trail easement) would be desired <br />as part of this project. This likely could align with the required 16.5 foot buffer required from the edge of any <br />wetland. <br />Landscaping and Density Transitioning <br />A Tree Inventory and Preservation Plan will be required (all oaks and evergreens 4 inches or greater in diameter <br />and all other trees 8 inches or greater in diameter are to be inventoried). Retention of at least forty percent (40%) of <br />the significant tree inches are to be preserved (or replaced at a rate of 1.25 inches for each 1 inch over the removal <br />threshold). Landscaping will also be required as outlined in City Code. <br />As laid out, the project does step down in density moving west, away from Armstrong Boulevard and toward the <br />adjacent, existing single family residential neighborhood north and west of the project. However, density <br />transitioning is applicable along the western and northern boundaries of the project (the adjacent neighborhood is <br />zoned R-1 Residential Rural Developing). Those lots will need have an increased depth of 45 feet (or 35 feet if a <br />berm is included) with additional plantings as outlined in City Code. <br />Utilities <br />The Subject Property is located within the MUSA boundary and therefore, sanitary sewer and water will need to <br />serve each unit. The project does conceptually include stormwater ponding. Those ponds, as well as all wetlands, <br />will need to be encumbered with drainage and utility easements extending at least 16.5 feet beyond their <br />boundaries. A street lighting plan will also need to be prepared and included as part of the plan set. <br />Staff also intends to explore options for extending utilities to the fire station through this development. These <br />improvements are included in the 10-year CIP, and it may be beneficial to the City (less expensive to construct and <br />easier to maintain and operate) to extend utilities to the Fire Station through this development, rather than to extend <br />the existing utilities south and east of the Fire Station. <br />Funding Source: <br />All costs associated with this request are the Applicant's responsibility. <br />Recommendation: <br />Staff is generally supportive of the Comprehensive Plan Amendment. However, significant revisions to the Sketch <br />Plan seem necessary. Most notably, there is a need to modify the layout to incorporate at least one additional point <br />of access and reducing any proposed cul-de-sac to no more than 600 feet. <br />Action: <br />
The URL can be used to link to this page
Your browser does not support the video tag.