Laserfiche WebLink
CC Regular Session <br />Meeting Date: 06/22/2021 <br />Submitted For: Joe Feriancek, Engineering/Public Works <br />By: Joe Feriancek, Engineering/Public Works <br />Information <br />5. 18. <br />Title <br />Adopt Resolution #21-180 Approving Plans and Specifications and Authorizing Advertisement for Bids for 2021 <br />Additional Pavement Overlay Improvements, Improvement Project #21-12 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #21-180 Approving Plans and Specifications and Authorizing <br />Advertisement for Bids for 2021 Additional Pavement Overlay Improvements, Improvement Project #21-12. <br />Background: <br />The 2021 — 2030 Capital Improvement Program (CIP) included an estimated $1,878,700 in 2021 Pavement <br />Management Program (PMP) projects, which include street reconstruction and pavement overlay improvements. <br />These projects were proposed to be funded through the Pavement Management (PM) fund. After the City Council <br />accepted bids and awarded contracts for all 2021 PMP projects included in the 2021 — 2030 CIP, a total of <br />$1,313,831.08 is anticipated to be spent from PM funds. This means $564,868.92 of PM funds that were designated <br />for 2021 PMP projects will remain unspent. <br />In past years, the City Council has directed Staff to fully utilize funds annually budgeted for necessary PMP <br />projects. Staff therefore proposes to expend additional funds on needed pavement overlay improvements in 2021 to <br />ensure all PM funds designated for 2021 PMP projects will be spent in 2021. Staff proposes to overlay an <br />additional 2.58 miles of street segments in 2021 which are proposed as 2022 pavement overlay improvements in <br />the 2021 — 2030 CIP. These street segments, which are shown on the attached project title sheet and are further <br />outlined in the attached street segment summary, were specifically selected since they are exhibiting pavement <br />stripping issues. This will allow the City to address stripping concerns on these streets one year sooner than <br />anticipated in the current CIP, reducing potential impacts to the underlying pavement structure. <br />Street segments proposed to receive additional bituminous pavement overlay improvements in 2021 are located in <br />the following developments: <br />• Reilley Estates <br />• Reilley Estates 2nd <br />• Reilley Estates 3rd <br />• Sunfish Gateway Business Park <br />• Traprock Commons <br />• Wildlife Sanctuary 2nd <br />• Wildlife Sanctuary 3rd <br />On June 8, 2021 the Ramsey City Council adopted resolution #21-159, ordering Staff to prepare plans and <br />specifications for Improvement Project #21-12, 2021 Additional Pavement Overlay Improvements. Staff has <br />prepared plans and specifications in-house, as part of their normal duties. <br />Final plans are not attached to this case to prevent potential bidders from downloading plans attached to the case to <br />prepare and submit their bids, rather than purchasing the plans through QuestCDN, the electronic bidding software <br />used by the City of Ramsey. This ensures that all bidders are bidding off the same set of plans, and that all bidders <br />