My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/22/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 06/22/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:01:47 PM
Creation date
7/19/2021 8:35:54 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/22/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
672
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. Proof of Authority. That the PER1VIITTEE provide proof that the respective <br />governing boards of the PERMITTEE have authorized the PERMITTEE'S <br />execution of this Agreement. This proof of authority may be satisfied by providing <br />the CITY with a certified copy of the minutes of the governing board of each entity <br />which grants such authority. <br />3. The Plans. The term "Plans" as used in this Agreement means the Site Plan and Final Plat <br />Plans prepared by Lampert Architects and CivilSite Group, dated March 5, 2021 and March <br />12, 2021. The Plans remain subject to: (a) CITY Staff's review and approval of the Plans <br />to, among other things, confirm that the revisions requested in the CITY Staff's review <br />letter have been made; and (b) such further revisions as the PERMITTEE may propose <br />and the CITY approves. The Plans shall not be attached to this Agreement, but are in the <br />CITY'S files. <br />4. Stage I Improvements. The public improvements the PERMITTEE will construct or <br />install are as follows: <br />a. Trunk and lateral sanitary sewer. <br />b. Trunk and lateral water main. <br />c. Storm drainage facilities (when specified). <br />d. Stormwater maintenance through 90 percent buildout. <br />e. Streets. <br />f. Concrete curb and gutter (urban). <br />g. Street traffic control signals. <br />h. Lot grading. <br />i. Trail development. <br />j. Sidewalks. <br />k. Electricity (within one-fourth mile). <br />1. Phone (within one-fourth mile). <br />m. Natural gas (within one-fourth mile). <br />n. Boulevard sodding. <br />o. Water shut off boxes. <br />p. Landscaping <br />(the "Stage I Improvements"). <br />The PERMITTEE agrees to construct the Stage I Improvements according to the terms <br />and conditions of this Agreement and in accordance with the Plans and the City Code. Per <br />City Code Section 117-615, the PERMITTEE shall provide the CITY with a set of re- <br />producible as -built plans in Computer Aided Drafting (CAD) format upon completion of <br />the Stage I Improvements and acceptance by the CITY. As as -built plans are a required <br />Stage I Improvement item per City Code Section 117-615, the CITY will not release in its <br />entirety the required Stage I Improvement Financial Guarantee noted in paragraph #6 <br />below until such as -built plans are received by the CITY. Additionally, the PERMITTEE <br />agrees to provide to the CITY the plans in CAD format prior to the commencement of <br />construction of the Stage I Improvements. <br />5. Lot Corner Staking. The PERMITTEE must install lot corner stakes at all lot corners. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.