Laserfiche WebLink
l;Tnal .l'la/ and Final Site Plan Review: Ramsey Town Center 8~h Addition <br />.~dy 22, 2005 <br />Pa, ge 5 <br /> been agreed upon and have already begun construction. This proposed development does not <br /> generate more traffic than was anticipated. <br /> <br />13. Stormwater Trunk Fees: The 2005 Stormwatcr Trunk Fee is $384.00 per unit. This fee <br /> will need to be paid prior to the release of/he final plat mylars. The fee in place at the time of <br /> thc plat being recorded is the one that will be charged. <br /> <br />1.4. Sewer and Water Trunk Fees: The 2005 Sewer and Water Trunk fees are $2,962.00 per <br /> unit. These fees will need to be paid prior to the release of the f'mal plat mylars, The fee in <br /> place at the time of the plat being recorded is the onethat will be charged. <br /> <br />15. Ramsey Town Center Phase I Roadway Improvements, Phase II Roadway <br /> hnprovements, AUAR Roadway Improvements, Parking Facility Improvements: In <br /> accordance with City of Ramsey Resolutions 05-02-065, 05-02-066, 05-02-067 and 05-02- <br /> 068, assessments for Ramsey Town Center Phase I Roadway Improvements,- Phase II <br /> Roadway Improvements, AUAR Roadway Improvements, and parking facility improvements <br /> shall be payable to the City in a single installment prior to the release of the final plat mylars <br /> for recording. Total payment due includes principal plus accrued interest in the amount of <br /> 6.3% per annmn commencing February 22, 2005. <br /> <br />16. Other Permits. The Developer is responsible for obtaining any and all permits required <br /> from other regulatory agencies. <br /> <br />17. Off-Street Parking Requirements: The TC-4 District requires 2 off-street parking spaces <br /> for each unit; this requirement is exceeded with the proposed 2-car garages and 20 foot wide <br /> driveways. Some parking is allowed on public streets, however, this may not be adequate for <br /> over fl()w parking. <br /> <br />18. Driveway Length/Width: Under the TC-4a Zoning Code, driveways for units with attached <br /> garages must be at least 25 feet in length, as measured from the building front to the edge of <br /> the sidewalk. On June 28, 2005 the City Council adopted changes to the TC-4a Zoning <br /> District, including lowering the minimum driveway length to 20 feet. <br /> <br />19. Landscapiug: The boulevard planting plan is acceptable. However, a revised plan must be <br /> submitted that addresses the landscaping for the individual lots. City Code requires that each <br /> lot receive two (2) trees and that not less than twenty-five percent (25%) consist of conifers. <br /> Even if the responsibility for installing this material is shifted to the builder/owner, the trees <br /> should be included on the plans. <br /> <br />20. <br /> <br />Ground Cover/Irrigation: The development is required to establish sod in all areas not <br />improved with structures or pavement. An irrigation system will need to be provided <br />throughout the development where sodded and landscaped areas will be established. Any <br />irrigation systems will need to be reviewed and approved by the City Engineer. <br /> <br /> <br />