My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/26/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 07/26/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:53:13 PM
Creation date
7/22/2005 3:48:41 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/26/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
517
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 21, 2005 <br />Ramscy Town Center 8th Addition Final Plat <br />Page 3 of 3 <br /> <br />· Provide valves on the north and south sides of Bunker Lake Blvd. Provide a valve <br /> mid block on 147th Terrace. <br /> <br />Page 33 <br /> <br />These plans assume the utilities south of Bunker will be in-place prior to <br />construction. If this will not be the case then these plans must include caps to be <br />rmnoved by others. <br />The 15" sanitary sewer from San Mit 33 to the stub must be laid at 0.15%. <br />A hydrant must be provided at the end of the stub for the future well. The hydrant <br />will be removed when the well is connected. <br />Note for Sanitary Sewer STA 20+85 change pipe material to "PVC". <br /> <br />Page 34 <br /> <br />The storm sewer lines shown as crossing do not match the sizes in the storm <br />plans. <br /> <br />Page 38 <br /> · The storm sewer crossing near Sta 2+60 must be insulated. <br /> <br />Page 39 <br /> <br />Provide detail of proposed curb ramp overlaid on Ramsey standard detail and <br />submitted for approval. <br />A path is required along the west property line as previously discussed. Sidewalk <br />connections must be provided between Lots 1 & 2, Block 5 and Lots 4 & 5, <br />Block 5 to the Path. <br />A sidewalk connection should be anticipated between lots 2&3, Block 2 to the <br />east property line and the 'future MSA Street. <br /> <br />Please incorporate these comments with our previous comments in the revised plans. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.