Laserfiche WebLink
as a lake, pond, wetland, stream or drainage ditch? <br /> <br />If yes, identify water resource affected and give the DNR Protected Waters Inventory <br />number(s) if the water resources affected are on the PWl. Describe alternatives <br />considered and proposed mitigation measures to minimize impacts. <br /> F_I No <br /> [] Yes <br /> DNR Protected Waters Inventory Number(s). none <br /> Thc project is located adjacent to'wetland areas. The proposed development plans to minimize the impact on <br /> wetland areas by providing a buffer to the wetlands, storm Water detention ponds, and limiting development to one <br /> road crossing. Figure 3 is a map of the DNR Protected Waters Inventory. Note that the project boundaries do not <br /> encompass any protected waters. <br /> <br />Will the project involve installation or abandonment of any water wells, connection to or <br />changes in any public water supply or appropriation of any ground or surface water <br />(including dewatering)? <br /> <br />If yes, as applicable, give location and purpose 0f any new wells; public supply affected, <br />changes to be made, and water quantities to be used; the source, duration, quantity, and <br />purpose of any appropriations; and unique well numbers and DNR appropriatiOn permit <br />numbers, if known. Identify any existing and new wells on the site map. If there are no <br />wells known on site, explain methodology used to determine. <br /> ~ No <br /> ~ Yes <br /> A well on the site (Minnesota Unique Well No. 430232) will be sealed in accordance with Minnesota Department <br /> of Ifealth requirement. ~y unexpected wells enco~temd on site Mll also be sealed in accordmce with <br /> Minnesota Depa~ment of Health requirements. The Ciw of Ramsay water dis~bufion system ~11 be.extended ~o <br /> serve the new houses. No ch~ge in water appropriation is expected. The additional driving w~er capaciW <br /> required will. be provided by the existing Ra~ey water supply wells. <br /> <br />Does any pa~ of the project involve a shoreland zoning district, a delineated 100-year <br />flood plain, or a state or federally designated wild or scenic river land use district? <br /> <br />If yes, identify the district and discuss project compatibility with district land use <br />restrictions. <br /> <br />The Mississippi River is designated as *'recreational" from Clearwater to the Anoka/Champlin line. The Mississippi <br />River Critical Area/Mississippi National River and Recreation Area also applies to the river n4ar. Ramsey. This <br />project is in FEMA Zone C (area outside o'fthe 100-year floodplain) of the Mississippi River (see Figure 4), It is <br />not in a state or federally designated wild or scenic river land use district. <br /> <br /> <br />