Laserfiche WebLink
(altmg with planned improvements) appears to have sufficient capacity to handle trips generated by the proposed <br />development. Congestion is not expected on local or regional roadways and adverse air quality effects do not <br />appear likely. No air quality monitoring has been completed for the proposed project at this time and no mitigation <br />measures are being proposed. <br /> <br />Describe the type, sources, quantities and compositions of any emissions from <br />stationary sources of air emissions such as boilers, exhaust stacks or fugitive dust <br />sources. Include any hazardous air pollutants (consult EAWGuidelines for a listing) and <br />any greenhouse gases (such as carbon dioxide, methane, nitrous oxide) and ozone~ <br />depleting chemicals (chloro-fluorocarbons, hydrofluorocarbons, perfluorocarbons or <br />sulfur hexafluoride). Aisc describe any proposed pollution prevention techniques and <br />proposed air pollution control devices. Describe the impacts on air. q_uality. <br /> The only sourccs of stationary air emissions will be from domestic heat sources fi'om residences. Fugitive dust may <br /> be generated during construction of the project. Best management practices will be followed as they are stated <br /> within the construction specifications. It is anticipated that the completed project will not generated significant dust <br /> beyond current site conditions. <br /> <br />:-.'?,2:z~:!:,:: Odors,~i~.i~N'Oise?~n:d~;D~!~.-::~ <br /> <br /> Will the project generate odors, noise or dust during construction or during operation? <br /> <br /> If yes, describe sources, characteristics, duration, quantities or intensity and any <br /> proposed measures to mitigate adveme impacts. Als0 identify locations of nearby <br /> sensitive receptors and estimate impacts on them. Discuss potential impacts on human <br /> health or quality of life. (Note: fugitive dust generated by operations may be discussed at <br /> item 23 instead of here.) <br /> ~ No <br /> ~ Yes - ' <br /> <br /> Temporary noise ~d odors may occ~ ~om operation ofhea~ equipment for ~ns~flction activities. <br /> Noises common to building homes will be generated d~ng conskucfion ofindi~dual b~lding projecB.. <br /> Construction activities will be conducted in confo~ance ~th the Ci~'s noise ordinance. Equipment ~ed in the <br /> daily construction operations will. be muffled. Noise ~om construction acfi~fies will be limited to T ~ ~ 10 pm <br /> weekdays, with weekend houm limited to 9 am to 9 pm. <br /> Dust will be controlled by periodic cleanup of the cons~cfion site and by limiting the ~o~t ofsoiI dis~bance. <br /> at any given time. Dust will also be con,oiled through the es~blishment ofpe~anent vegetative cover. <br /> Consideration will be given to suppression of airbbmp d~t by application of water if si~ificant d~t generation <br /> cecum during site grading. <br /> After the roads m~d homes are constructed, odors, d~t and noise should be limited to ~at t~ic~ cfa residential <br /> <br /> Thc nearest sensitive receptors are the residential homes in the nearby existing ho~ing'developmen~: <br /> <br /> <br />