My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/26/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 07/26/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:53:13 PM
Creation date
7/22/2005 3:48:41 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/26/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
517
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~11. The City shall pay for one hundred percent (100%) of the cost of <br /> :walk installed on the project. The estimated cost to the City is $0.00. <br /> <br /> 12. In place concrete walk will be replaced by the County at no cost to <br /> thc City. <br /> <br /> 13. The City shall pay one hundred percent (100%) of the cost of new <br />bituminous trails. The City's estimated cost for the trail is $4,160.00. <br /> <br /> 14. The City shall pay one hundred percent (100%) of the cost of any <br />strcct lighting included in the project. The design and installation of ornamental <br />strectlights shall be in accordance with the County's specifications. The City's estimated <br />cost fbr street lighting is $ 0.00. <br /> <br /> 15. The City shall pay to the County thirty-seven point five percent <br />(3 7.5%) o l' the cost of construction and installation of the' ~hole traffic actuated signal <br />system (including County supplied materials). The City's estimated share of the <br />construction is $55,125.00. <br /> <br /> 16. <br />interconnect costs. <br /> <br />The County shall pay one hundred percent (100%) of all <br /> <br /> 17. The City shall pay one hundred percent (50%) of Emergency <br />Vchiclo Pre-emption (EVP) costs. The City's estimated share of the construction is <br />$12,500.00. <br /> <br /> 18. The City shall pay their share of mobilization and equipment field <br />ol"ficc as determined using the Engineer's Estimate. The estimated City cost of these <br />itcms is $5,040.00. <br /> <br /> 19. The City shall pay their share of detour signing and traffic control <br />as determined using the Engineer's Estimate. The'estimated City cost of these items is <br />$2,979.20. <br /> <br />20. The total estimated cost to the City for the project is summarized below: <br /> <br />1 Right of Way $0.00 <br />2 Construction or Adjustment of Local Utilities $60,222.50 <br />3 Dysprosium St. Construction Costs $5,581.75 <br />4 Storm Sewer $26,867.51 <br />5 Detention Basins (incl in Storm Sewer) <br />6 Concrete Curb & Gutter $16,716.00 <br />7 Decorative Medians $0.00 <br />8 Median Plantings $0.00 <br />9 Driveway Upgrades $0.00 <br />10 Concrete Sidewalk $0.00 <br />11 Trails $4,160.00 <br />12 Street Lights $0.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.