Laserfiche WebLink
PAY ESTIMATE #2 <br /> Ramsey Town Center Phase 2, Segment 1 Improvements <br />Zeolite Street NW, Civic Center Drive NW and Sapphire Street NW <br />Improvement Project No. 65-22 <br /> <br />Owner <br /> <br />BID SCHEDULE"A"-CONTINUED <br /> <br /> Used to <br /> Item Descriptio, n Estimated Quantit7 Unit Price Contract Price Date Extension <br /> <br /> 46 EXTRA DEPTH MANHOLE (OVER 8"1 48 31 LF $100.00 $ 3,100.00 25 $ 2,500.00 <br /> 47 4" CONCRETE WALK 2500 SF $3.00 $ 7,500.00 $ <br /> 48 VALLEY GUTTER 78,0 LF $14.00 $ 10,920.00 <br /> 49 CONCRETE CURB AND GUTTER DESIGN B618 5700 LF $8.00 $ 45,600.00 $ <br /> 50 CONCRETE CURB AND GUTTER DESIGN B624 132 LF , $17-00 $ 2~244;,00 $ <br /> 51 7" CONCRETE DRIVEWAY PAVEMENT 2450 SF $3.90 $ 9,555.00 $ <br /> 52 PEDESTRIAN CURB RAMP 2 EACH $360.00 $ 720.00 $ <br /> 53 F & I 2" RIGID STEEL CONDUIT 1~9 LF $4.00 ~$ 356,00 $ <br /> 54 F & I 4" RIGID STEEL CONDUIT 178 LF $5.00 $ 890,00 $ <br /> 55 SIGN PANELS TYPE C 30.75 SF $28,00 $ 861.00 $ <br /> 56 TRAFFIC CONTROL 1 LS $750.00 $ 750.00 1 $ 750.00 <br /> 57 TYPE III BARRICADE 4 ,EACH $245.00 $ 980.00 $ <br /> 5~ PAVEMENT MESSAGE ILEFT ARROW) EPOXY 4 EACH $100.00 $ 400.00 $ <br /> 59 F & I SIGN PANEL TYPE"D" 3 EACH $275.00 $ 825.00 $ <br /> 60 4" BROKEN LINE YELLOW EPOXY 2645 LF .,$0-01 $ 26.45 $ <br /> 61 4" SOLID LINE WHITE - EPOXY 3045 LF $0.50 $ 1,522.50 $ <br /> 62 24" STOP LINE WHITE - EPOXY , 53 I LF .. $5.15 $ 272.95 $ <br /> <br /> 63 4" DOUBLE LINE BROKEN & SOLID YELLOW- EPO) 515I - LF $0.50 $ 257.50 $ <br /> 64 24" SOLID LINE WHITE - EPOXy 44 LF $5.,15 $ 226.60 $ <br /> <br />65 4" SOLID LINE WHITE - PAINT 2675 LF $0.38 $ 1,016.50 <br />66 4" DOUBLE LINE BROKEN & SOLID YELLOW- PAIN' 515 LF $0.38 $ 195.70 $ <br />67 INSTALL 4". 6- PVC ISCH40) CONDUIT 600 LF ,.$3.00 $ 1,800.00 $ <br />68 BALE CHECK 50 EACH $10.00 $ 500.00 $ <br />69 SILT FENCE TYPE MACHINE SLICED 6000 LF $1.65 $ 9,900.00 $ <br />70 TEMPORARY CONSTRUCTION ROCK ENTRANCE 2 EACH $750.00 $ 1,500.00 $ <br />71 SEEDING 2.0 ACRE $,500.00 $, 1,000.00 $ <br />72 SEED MIXTURE 260 200 LB $2.2.0 $ 440.00 <br />73 MULCH MATERIAL TYPE 3 4 TON $145.00 $ 580.00 <br />74 EROSION CONTROL BLANKETS CATEGORY 3 4000 SY $1.70 $ 6,800.00 $ <br />__75 COMMERCIAL FERTILIZER ANALYSIE~24-2-24 700 LBS $0.40 $ 280.00 $ <br /> <br />Total Bid Schedule 'W' - Street Construction $ 562,023.30 $ 246,337.40 <br /> <br />SUMMARY OF BIDDING <br /> <br />Bid Schedule "A" - Street Construction <br />Base Bid Total <br /> <br />562,023.30 <br />562,023.30 <br /> <br />562,023.30 <br /> <br />246,337.40 <br />246,337.40 <br /> <br />246,337.40 <br />12,316.87 <br />171,141.55 <br />62,878.98 <br /> <br />/OTAL <br /> <br />LESS5% RETAINAGE <br /> <br />LESS PAY ESTIMATE#1 <br />WE RECOMMENDPAYMENTOF: <br /> <br />APPROVALS: <br /> <br />CONTR~",CTOR: W.B. MILLER, INC. <br /> Cedi~o.n by 6~ntr~c,,to.,r:. I certify that all items and amounts are correct for the work completed to date. <br /> <br />Title: ~- ?? Dale <br /> <br />ENGINEER: HAKANSON ANDERSON ASSOCIATES, INC. <br /> Cedification by Engineer: We reconjl~end payment for work and quantifies as shown. <br /> <br />OWNER: <br />CITY OF RAMSEY <br />Signed: <br />Title: Date <br /> <br />,~3176PEPay £shmale l'2 PE - 2 of 2 <br /> <br /> <br />