PAY ESTIMATE #4 <br />Rhinestone Street Bridge Project <br />S.A;P. 199-109-02 <br /> CITY OF RAMSEY <br /> <br />Contractor <br /> <br />July 8, 2005 <br />Honorable Mayor & City Council <br />City of Ramsey <br />15153 Nov'then Blvd. NW <br />Ramsey, MN 55303-6197 <br /> <br />RE: Rhinestone Street Bridge ~ S.A.P. 199-109-02 <br />Contractor: Redstone Construction <br />Contract Amount: $999,279.30 <br />Award Date: October 13, 2004 <br />Completion Date: August 15, 2005 <br /> <br />Dear Council Members: <br /> <br />The following work has been completed on the above-referenced project by Redstone Construction <br /> <br />BiD SCHEDULE "A" S.A.P, 199-109-02 - RHINESTONE STREET BRIDGE Redstone Construction <br /> <br /> Used to <br /> Item Description Estimated Quantity Unit Price Contract Price Date Extension <br /> <br /> 1 MOBILIZATION I LS $53,310.91 $ 53,310.91 0.5 $ 26,655.46 <br /> 2 COMMON EXCAVATION 104(] CY $6.77 $ ~,040.80 1000 $ 6,770.00 <br /> 3 SELECT GRANULAR MATERIAL 10% (CV) 1438 CY $15.48 $ 22,136.40 1430 $ 22,136.40 <br /> 4 SELECT GRANULAR BORROW (CV) 151~ CY $14.161 $ 2,124.00 125 $ 1,770.00 <br /> 5 AGGREGATE BASE (CV) CLASS 5 (MOD) 128 CY $33.27, $ 4,258,56 25 $ 831.75 <br /> 6 CONCRETE PAVEMENT STD. WIDTH 7.0~' 136 SY $71.53 $ 9,728.08 112 $ 8,011.36 <br /> 7 STRUCTURAL CONCRETE 27 CY $100.64 $ 2,717.28 30 $ 3,019.20 <br /> 8 BRIDGE APPROACH PANEL 1.74 EACH $18,875.79 $ 32,843..87 1.74 $ 32!843.87 <br /> 9 STRUCTURAL CONCRETE (1A43) 197 (P) CU. YD. $241.38J $ 47,551.86 197 $ 47,551.86 <br /> 10 STRUCTURAL CONCRETE (3Y43) 385 (PI CU. YD. $384.59 $ 148,067.15 385 $ 148,067.15 <br /> 11 STRUCTURAL CONCRETE (3Y36) 386 (PI CU. YD. . $291.93 $ 112,684.98 366 $ 112,684.98 <br /> I2 TYPE MODIFIED P-2 RAILING CONCRETE (3Y46) 249 (P) LIN. FT. . $84.14 $ 20,950.86 0 $ <br /> 13 SIDEWALK CONCRETE (3Y46) 1475 (PI SQ. FT. $6.22 $ 9,174.50 0 $ <br /> 14 REINFORCEMENT BARS 13165 (PI POUND $0.90 $ 11,848.50 13165 $ 11,848.50 <br /> 15 REINFORCEMENT BARS (EPOXY COATED) 139900 (P} POUND $0.88 $ 123,112.00 139900 $ 123,112.00 <br /> 16 STRUCTURE EXCAVATION 0.94 LUMP SUM $11,119.181 $ 10,452.03 0.94 $ 10,452.03 <br /> 17 --OUNDATION PREPARATION 1 LUMP SUM $36,131.95 $ 36,131.95 1 $ 36,131.95 <br /> <br /> 18 ORNAMENTAL METAL RAILING TYPE SPECIAL 311 (P! LIN. FT. $166.691 $ 51,840.59 0 $ <br /> <br /> 19 STRUCTURAL TUBE RAILING DESIGN T-1 .224 (PI LIN. FT. $92.72 $ 20,769.28 0 $ <br /> 20 EXPANSION JOINT DEVICES TYPE 4 118 LIN. FT. $116.57' $ 12,822.70 110 ...$. 12,822.70 <br /> 21 BEARING ASSEMBLY 12 EACH $883.02 $' 10,596:2.'4 12' .$ 101596.24 <br /> 22 DRAINAGE SYSTEM TYP (B910) 0.87 LUMP SUM $1,106.09 $ 962.30 0.87 $ 962.30 <br /> 23 CONCRETE WEARING COURSE (3U17A) 5550 (PI SQ. FT. $6.22 $ 34,521.00 0 $ <br /> 24 C.I.P. CONCRETE PILING DELIVERED 12" 3096 LIN. FT. $21.93 $ 67,763.70 3026.5 $ 66,371.15 <br /> 25 C.LP. CONCRETE PILING DRIVEN 12" 309~ LIN. FT. . $1.13 $ 3,491.70 2871 $ 3,244.23 <br /> 26 C J.P. CONCRETE TEST PILE, 65 FT.LG. 12" 4 EACH $7,356.17 $ 29,424.68 4 $ 29,424.68 <br /> 27 C.I.P. CONCRETE TEST PILE, 75 FT.LG.12" 2 EACH $8,487.89 $ 16,975.78 2 $ 16,975.78 <br /> 28 CONDUIT SYSTEM (LIGHTING) 1 LUMP SUM $16,091.38 $ 16,091.36 0.5 $ 8,045.69 <br /> 29 4" CONCRETE WALK 124~ SF $4.73 $ 5,874.66 0 $ <br /> <br /> 30 6" CONCRETE WALK 12(: SF $6.86 $. 823.20 0 $ <br /> <br />ii 31 CONCRETE CURB AND GUTTER DESIGN B618 16(: LF $26.07 $ 4,171.20 0 $ <br />32 INTEGRANT CURB & GUTTER DESIGN B6 5c, LF $14.36 $ 847.24 53.5 $ 768.26 <br />L 33 PEDESTRIAN CURB RAMP 21 EA $686.25 $ 1,372.50 0 . $ <br /> <br />Total Bid Schedule "A" - Rhinestone Street Bridge <br /> <br />$ 932,481.88 $ 741 ,~)97153 <br /> <br />RA3173PE xl~Pay E~hrnale #4 PE - 1 <br /> <br /> <br />