My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/27/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 07/27/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:04:52 PM
Creation date
8/11/2021 8:56:41 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/27/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />APPROACH & SCHEDULE <br />Understanding <br />This is an exciting time as the City of <br />Ramsey takes the next steps to provide <br />filtered drinking water to all residents of <br />the City. This project offers opportunities <br />to achieve water quality goals, including <br />iron and manganese removal, customize <br />the facility design to consider operations <br />and maintenance, and seamlessly integrate <br />the building into the public works campus. <br />AE2S is excited about the opportunity to <br />work closely with the City of Ramsey team <br />to not only exceed near -term objectives, <br />but also to design and construct a facility <br />that implements the best long-term <br />solutions. <br />No one knows the existing Ramsey <br />Water System better than you and your <br />operations team. You have responsibly <br />operated your existing system for years <br />and have set yourselves up to successfully <br />bring the vision of a fully integrated public <br />works campus to life. We understand that <br />these next steps will be building upon <br />the City's previous work, including the <br />most recent 2021 Water Treatment Plant <br />Feasibility Study. AE2S intends to work <br />closely with Ramsey representatives <br />and our teaming partners to ensure that <br />this project is a true collaboration of <br />our project teams, resulting in the most <br />successful project possible. <br />APPROACH & SCHEDULE (11) <br />DEFINING SUCCESS <br />FOR RAMSEY <br />Operationally friendly, <br />maintainable, and <br />complaint mitigating water <br />plant. <br />rifio Architecturally <br />integrated, efficient, and <br />accommodating campus. <br />Informed, equipped, and <br />empowered operators. <br />OPERATIONS & MAINTENANCE <br />FOCUSED WTP APPROACH <br />Our team offers Ramsey an <br />opportunity to focus the next phases <br />on creating a water treatment facility <br />with operations and maintenance at the <br />forefront. The Public Works Building <br />sets the stage for the aesthetic and <br />construction materials desired by Ramsey, <br />eliminating the need for workshops and <br />planning needed early on in most facility <br />designs. Time savings related to: <br />• Architectural finishes and <br />construction materials — <br />consistency throughout the <br />campus <br />• Site design through institutional <br />knowledge of the site and existing <br />underground utilities <br />• Maintaining consistency with <br />controls and integration <br />Our project team has built a <br />dependable relationship with proven <br />success on many relevant projects. Project <br />team members of all roles have worked <br />together before. These relationships result <br />in teamwork and the ability to anticipate <br />each other's needs, introducing even more <br />efficiency in the project delivery. <br />M <br />AE2S utilizes 3D Modeling Software as the <br />design/drafting tool for all new facilities. The <br />model creation assists throughout the design <br />process by identifying conflicts and reducing costly <br />change orders. The model also allows for the design team to virtually <br />"walk through" the facility to get a feel for space, layout, and appearance <br />of the planned WTP. The 3D tool can also be extended outside the facility <br />to demonstrate virtual "fly -over" videos to see the WTP as a part of the <br />campus and to communicate with stakeholders and the public. <br />For an example of our 3D tool's potential capabilities visit: <br />www.ae2s.com/3D-renderings <br />AE2S CITY OF RAMSEY DESIGN & CONSTRUCTION - MUNICIPAL WATER SUPPLY TREATMENT PROPOSAL 3.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.