Laserfiche WebLink
Schedule C — Trunk Storm Sewer Improvements & Outfall to River <br />Item <br />1. <br />2. <br />3. <br />4. <br />5. <br />6, <br />7. <br />8. <br />9. <br />10. <br />1.. <br />12, <br />13. <br />Description <br />Jack 60" Casing <br />Jack 48" RCP <br />48" Carrier Pipe <br />42" RC Pipe Sewer Design 3006 CL <br />48" RC Pipe Sewer Design 3006 CL <br />Jack 42" RCP <br />42" FES <br />48" FES <br />42" Outlet Structure <br />Skimmer Structure <br />Pond Liner <br />Sand Cushion <br />Storm. Manhole <br />Subtotal: <br />OVERHEAD & CONTINGENCY 35%: <br />Extension <br />$78,000.00 <br />$126,000.00 <br />$13,760.00 <br />DI $21,600.00 <br />III $13,760.00 <br />$434,000.00 <br />$3,200.00 <br />$15,200.00 <br />$5,000.00 <br />$12,000.00 <br />$254,250.00 <br />$169,200.00 <br />$3,000.00 <br />$1,148,970.00 <br />$402, 1 39.50 <br />Subtotal C --- Trunk Storm Sewer Costs: $1,551,109.50 <br />so <br />so <br />MAXIMUM TOTAL COUNTY PARTICIPATION: $4,581,500 <br />