My WebLink
|
Help
|
About
|
Sign Out
Home
08/12/21
Ramsey
>
Public
>
City Update
>
2021
>
08/12/21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:53:48 AM
Creation date
8/12/2021 3:00:38 PM
Metadata
Fields
Template:
City Clerk
City Clerk Document Type
City Update
Document Date
12/31/2021
Document Title
08/12/21
Retention Date
12/31/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
aitvgel <br />F.�r,Irtre:; <br />Anoka County <br />TRANSPORTATION DIVISION <br />August 2, 2021 <br />Re: Construction of County Highway 56 (Ramsey Blvd) and County Highway 57 <br />(Sunfish Lake Boulevard) interchanges at US Highway 10 with overpasses at <br />BNSF Railroad Tracks <br />Dear Resident or Business Owner: <br />The Anoka County Highway Department, in cooperation with the City of Ramsey, is <br />in the process of developing preliminary plans for the construction of roadway <br />overpasses at both County Highway 56 (Ramsey Blvd) and County Highway 57 <br />(Sunfish Lake Boulevard) at US Highway 10. Construction is tentatively scheduled to <br />begin in 2023. The purpose of the project is to improve public safety and reduce traffic <br />congestion on US Highway 10 by constructing grade -separated interchanges at both <br />Ramsey Blvd and Sunfish Lake Boulevard including railroad overpasses. <br />You may notice activity in the area over the next few months as field data is collected <br />for the project. Work will include: <br />• Topographic and utility surveys <br />• Soil borings to collect samples <br />A live public open house was held in February 2021 followed by a virtual open house <br />in May 2021. A third public open house will take place in early 2022 to share the <br />preliminary project layout and construction staging plan. All residents and business <br />owners in the area will be notified by mail regarding a time and place for this meeting. <br />To learn more about this project, please visit the project website: <br />https://www.anokacountv.us/3918/Hwv-10Ramsev-Blvd-Interchange <br />We would appreciate your cooperation in this important project. Please drive safely <br />in the area as we begin to collect field data, as well as throughout the construction <br />period. We look forward to working together with you for this reconstructive effort. If <br />you have any immediate questions or concerns regarding this project, please feel free <br />to call me at (763) 324-3118, I can also be reached by email at nicholas.dobda <br />na.co.anoka.mn.us . <br />Sincerely, <br />Nicholas Dobda, P.E. <br />Project Manager <br />cc: Joe MacPherson, P.E, Anoka County Engineer <br />Bruce Westby, P.E, Ramsey City Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.