My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 08/26/2021
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2021
>
Agenda - Planning Commission - 08/26/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:09:06 AM
Creation date
8/20/2021 10:07:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
08/26/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
independently from the properties to the south, however, it is much more likely that they will develop in <br />tandem due to the large costs associated with developing the site alone. Trunk utilities will need to be <br />brought to this site in order for it to develop. <br />. Sidewalks and Trails: The City requires a sidewalk on every side of a public street. Additionally, the City <br />will require a trail along Nowthen Blvd, 173rd, and 175th. 175th is likely to be reconstructed in the future, or <br />potentially realigned, so the developer has the option to pay into the trail fund or build the trail along 175th. <br />Additionally, there will need to be a pedestrian crossing on 173rd. <br />. Roads: 173rd will need to be upgraded to a full public road as part of this project. The Applicant is working <br />with the Applicant to the south coordinating on this item. It is likely that there will be a cost -share agreement <br />outlined as part of road project, which will be discussed with the Applicants and City Council. <br />. Lot Sizes and Alignments: All of the proposed lots are 80 foot wide lots, proposed outside of the large gas <br />easement on the property. There is additional landscaping proposed along the western boundary with existing <br />residential lots. The existing home on the SE lot will be removed as part of this project. <br />. Timing: Based on the time of year, and need to get trunk utilities (sewer and water) to the Subject Properties, <br />it is very unlikely there will be any homes built onsite this year. There may be some preliminary grading <br />(moving dirt) on the Subject Properties this year. <br />Platting Process <br />1. Sketch Plan - Identify red flags and direct the Applicant on moving forward to Preliminary Plat <br />2. Preliminary Plat - Engineering documents, formal public hearing, if approved, the project has entitlement (we <br />are here) <br />3. Final Plat - Construction documents and legal agreements, only heard by City Council <br />City Code Sections <br />. Section 117-111: R-1 Residential (Existing and Proposed Zoning) <br />. Section 117-588: Major Plat <br />. Section 117-614: Subdivision Design Standards <br />Funding Source: <br />The Applicant is responsible for all costs associated with review. <br />Recommendation: <br />Staff recommends approval of the project and recommends adoption of Resolution 421-248. <br />Action: <br />Motion to Recommend the City Council Adopt Resolution 421-248 Approving Preliminary Plat for North Brook <br />Meadows. <br />Site Location May <br />Preliminary Plat Plan Set <br />Planning Tech Report <br />Preliminary Staff Comments (ProjectDox) <br />Resolution 421-248 <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Bruce Westby Bruce Westby 08/19/2021 12:57 PM <br />Form Started By: Brian McCann Started On: 08/17/2021 10:27 AM <br />Final Approval Date: 08/19/2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.