Laserfiche WebLink
INSTRUCTVIONV <br />1111111111111111111111111 <br />i' lIIIol000liiiiilll) <br />w�nnmN�,° <br />Vu ook 6tiSU4rl <br />w <br />Folllllus on Itivufler rjrocoirost uct ouii <br />City a 11f OR a na s,,w.y ,,,,„ III' uu.ull <br />Iro,g <br />Ilf <br />orn <br />b <br />h <br />liico WoIIr ks <br />oo UIII dat,,w, <br />or 2u, 2021 <br />The concrete patio is now poured and complete. The final <br />lift of asphalt will be going down on 9/9/21. <br />The WonDoor in the reception area is now installed. <br />The install of the vehicle wash equipment in the wash bay <br />has started and is currently ongoing. <br />discover the projects <br />## wilds <br />