My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 09/09/2021
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2021
>
Agenda - Parks and Recreation Commission - 09/09/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 11:41:52 AM
Creation date
9/3/2021 1:27:13 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
09/09/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
111111 <br /> mon <br /> ���Ill�lll�ll�ll�ll �III�II V �i���»�oy�� direct: 52.89 5. <br /> D LAyscA D Es lax 3 2.89 ,88 9 <br /> to free: 800 T47.J452 <br /> HC b2 Ek.3gle Creek C. i r:Ocz, E�, avdgr , ("iN 557:/E1: <br /> www.M1DWESTPLAYSCAPES.complay ca e (c e rthiinik.net <br /> III III B8 IU ' ' V 1(;, f° '„..... <br /> m 11 <br /> Project: City of Ramsey Phone: 763-464-7099 <br /> Contact: Andy Fax: <br /> Ship To: Bill To: <br /> Ramsey, MN 55303 <br /> Email: ablood@ci.ramsey.mn.us <br /> Shipping Contact Name: Date: 6/27/2019 <br /> Qty Design/Item # Description Total <br /> 1 ZZCH3129 90 degree Glide Slide $ 1,242.00 <br /> Plastic Color: Beige <br /> Post Color: <br /> Railings Color: <br /> Subtotal $ 1,242.00 <br /> Freight $ 316.00 <br /> Tax Exempt # *Please provide certificate Sales Tax $ <br /> Local Sales Tax $ <br /> Total $ 1,558.00 <br /> NOTE:Customer would be responsible for unloading,freight inventory and installation. <br /> NOTE:New Footings will need to be done. <br /> NOTE:Any Insurance requirements above $1,000,000 General Liability will be subject to a surcharge <br /> NOTE: UNLESS OTHERWISE NOTED,prices shown are material only.They DO NOT include:assembly,installation,border,safety surfacing, <br /> drain tile,geotextile fabric,removal of existing equipment,site preparation,excavation or site restoration,unloading of equipment,disposal of <br /> packaging material,storage of equipment,additional insurance and bonding would be extra,unless otherwise stated above.If playground <br /> equipment or materials are stored off site,customer is responsible for transporting equipment to job site. <br /> Prices firm for 30 days,subject to review thereafter. Our terms are net 30. A finance charge of 1.5%will be imposed on the outstanding balance unpaid <br /> for more than 30 days after the shipment of materials.Equipment shall he invoiced seperately from other services and shall he payable in advance <br /> of those services and project completion.Retainage not accepted.Once customer has signed quotation,your order cannot he changed or canceled.Please <br /> allow 3to4 weeks.for delivery after receipt of order. Standard manufacturing design,specification,and construction apply unless noted otherwise. Customer <br /> is responsible for the identification and marking of all underground utilities(public or private)to include drain tile and sprinkler systems.Area must he <br /> accessible to Bobcat and other equipment necessary for installation or additional fees will he charged.Freight quote is based on customer unloading <br /> equipment and checking in all equipment for any missing parts.If product is refused by customer upon delivery for any reason(unless damaged), <br /> without prior authorization from Midwest Playscapes,Inc., the customer agrees to pay 20%restocking,fee plus freight charges. <br /> Price does not include prevailing wages,unless otherwise noted. If we can he of Other Assistance,please feel free to contact us. <br /> Signed: Accepted <br /> Bruce Pudwill Date: <br /> Printed Name: <br />
The URL can be used to link to this page
Your browser does not support the video tag.