My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/10/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 08/10/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:05:41 PM
Creation date
9/17/2021 1:42:48 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/10/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 5. 10. <br />Meeting Date: 08/10/2021 <br />By: Chloe McGuire Brigl, Community <br />Development <br />Information <br />Title: <br />Adopt Resolution #21-210 Approving Site Plan and Final Plat for Knoll Properties 2nd Addition; Case of Anderson <br />Dahlen <br />Purpose/Background: <br />The purpose of this case is to review a request from Kinghorn Construction on behalf of Anderson Dahlen (the <br />"Applicant") for a site plan and associated plat for Knoll Properties 2nd Addition. The Subject Property is located <br />east of Ramsey Blvd and north of Sunwood Drive. The site is currently vacant and owned by Connexus Energy. <br />The proposed project is a large, approximately 65,000 square foot industrial building with a future —52,000 square <br />foot planned expansion/second phase. The site is zoned E-2. <br />Notification: <br />No notification is required, as the proposed project does not include any deviations from the City Code <br />requirements. <br />Observations/Alternatives: <br />General <br />The purpose of this report is to approve a Final Plat (Knoll Properties Second Addition) and Site Plan for <br />Anderson-Dahlen, located east of Ramsey Blvd and north of Sunwood Drive. The Applicant, Kinghorn <br />Construction, on behalf of Anderson Dahlen, has platted one (1) lot and two (2) outlots, from property which had <br />previously been platted as Outlot A of AEC Energy Park. The property is currently vacant. <br />Lot Area, Width and Setbacks. <br />E-2 Employment District <br />Standard <br />Minimum Lot Size <br />Minimum Lot Width <br />Minimum Front Yard Setback <br />Minimum Rear Yard Setback <br />Minimum Side Yard Setback <br />Maximum Building Height <br />Building Size <br />,-- <br />Required Proposed <br />1.0 acre <br />200 feet <br />35 feet <br />25 feet <br />25 feet <br />65 feet <br />n/a <br />Eot 1 Outlot A Outlot B. <br />5.8 A 2.8 A 5.3 A <br />805 ft. 1-262 ft. 462 £t <br />—94 feet <br />—145 feet <br />—86 feet <br />45 feet <br />64,416 square feet <br />
The URL can be used to link to this page
Your browser does not support the video tag.