Laserfiche WebLink
COMMENTS & RESPONSES <br /> <br />Commentor : <br /> <br />Phyllis Hanson, Manager, Planning and Technical Assistance <br />Metropolitan Council <br /> <br />Comment Date : July 14, 2005 <br /> <br />Thank you for your response regarding the Sweetbay Ridge Development Environmental Assessment <br />Worksheet. <br /> <br />Item 6: Project Description <br />The preliminary plat of the development has 158 homes. <br /> <br />Item 8: Permits and Approvals Required <br />The reference to a metropolitan urban service area (MUSA) extension and a comprehensive plan <br />amemhnent should not have been included in Item 8. <br /> <br />lien} 13: Water Use <br />The design average water use of 150 gallons per person per day is a conservative design value for <br />planning purposes. As you suggested, the City will be consistent with the July 2004 Comprehensive <br />Water System Study. In addition, the City will promote reduced lawn watering, drought tolerant <br />landscaping and appropriate site preparation in order to reduce water use. <br /> <br />Item 17: Water Quality, Surface Water Runoff <br />The City will look for opportunities to incorporate low impact development features to help treat runoff <br />and recharge the groundwater table. <br /> <br /> <br />