My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/09/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 08/09/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:53:41 PM
Creation date
8/5/2005 2:29:10 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/09/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
460
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h) Adjusting water shut-offboxes <br />i) Maintenance of storm water and facilities <br />j) Boulevard sodding <br /> <br />("Stage II Improvements") <br /> <br />19. Payment for Stage II Improvements. The CITY will install in the Plat the Stage II <br /> Improvements. The DEVELOPER shall also deposit an amount that is determined by the <br /> CITY to be adequate to aid in the operation and maintenance of street lights in locations <br /> within the Plat determined by the City Engineer and installed by Connexus for the first three <br /> (3) years after final plat approval. The CITY will bill residents in the Plat at least .quarterly <br /> for street light maintenance and operation costs; billing will be initiated at the time a <br /> residence connects to municipal water and sanitary sewer. The DEVELOPER will pay to <br /> the CITY an amount equal to 100% of the City Engineer's estimated construction cost of the <br /> items prior to recording of the final Plat. The City Engineer's estimated cost of construction <br /> is: <br /> <br />a) Street striping and signing (11 65200) <br />b) Traffic signing (765200) <br />c) Future Through Street Signing (065200) <br />d) Street lights (12 651700) <br />c) Street light maintenance (12 ~$270) <br />t) Street sweeping <br />g) Seal coating (6800 sq. yds ~$.85/sq. yd.) <br />h) Boulevard sodding <br /> <br />$2,200.00 <br />$1,400.00 <br />$0.00 <br />$20,4O0.00 <br />$3,240.00 <br />$5O0.0O <br />$5,780.00 <br />$3,500.00 <br /> <br />("Stage ii Improvements") <br /> <br />Total $37,020.00 <br /> <br />20. Hard Surfaced Driveways. Hard surfaced driveways (bituminous or concrete) are a <br /> requirement for each lot in the Plat. Said improvement shall be installed by the building <br /> permit applicant or the homeowner at the time the Certificate of Occupancy is issued or as <br /> soon thereafter as possible, weather permitting. In the event this improvement is not timely <br /> installed on a lot, the DEVELOPER and/or the DEVELOPER'S assign(s), agrees that the <br /> CITY may install said improvement on the lot and specially assess the cost therefore against <br /> the lot. The DEVELOPER hereby waives all right to a public hearing and other statutory <br /> rights or City Charter rights granted a property owner relating to special assessments, <br /> including the right to appeal the special assessment for installation of the hard surfaced <br /> driveway. In addition, the DEVELOPER grants the CITY a license to enter on each lot of <br /> the Plat in order to install the improvement described in this paragraph if the same has not <br /> been previously constructed. <br /> <br />21. Street Cleaning. After the street surfacing is installed, the DEVELOPER shall clear any <br /> soil, earth, or debris from the streets within the Plat resulting from any construction within <br /> thc l'lat by the DEVELOPER or its successors and assigns. From time to time, the CITY <br /> may remove accumulations of soil, earth and debris from the streets resulting from the <br /> Town Center Gardens 3ra Addition <br /> Development Agreement <br /> Page 6 of 12 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.