My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/24/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 08/24/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:07:01 PM
Creation date
9/30/2021 9:19:30 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/24/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session <br />Meeting Date: 08/24/2021 <br />Submitted For: Bruce Westby, Engineering/Public Works <br />By: Marsha Weidner, Engineering/Public Works <br />Information <br />5. 11. <br />Title <br />Adopt Resolution #21-234 Approving Change Order #1 for Business Park 95 Street Reconstructions, Improvement <br />Project #21-03 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #21-234 approving Change Order #1 for Business Park 95 Street <br />Reconstructions, Improvement Project #21-03. <br />Background: <br />The purpose of Change Order #1 in the amount of $9,750.00 is to allow the contractor to replace damaged <br />watermain gate valve boxes, which were damaged while lowering the valve boxes prior to reclamation of the <br />existing bituminous pavement and aggregate base. Gate valve boxes are designed to screw up and down, however, <br />the existing valve boxes were locked in place and could not be adjusted requiring removal and replacement to <br />complete the work per approved plans and specifications and to allow continued access to the watermain gate <br />valves within the project area. <br />A copy of Change Order #1 is attached, including the Contractor's and the City Engineer's signatures. <br />The work covered by this Change Order has been completed as this work was necessary to allow the project to <br />continue without delays. No extension of time is approved as part of Change Order #1. <br />Payment for work covered by Change Order #1 will be paid with water utility funds. <br />Recommendation: <br />Staff recommends adopting Resolution #21-234 approving Change Order #1 for Business Park 95 Street <br />Reconstructions, Improvement Project #21-03. <br />Action: <br />Adopt Resolution #21-234 approving Change Order #1 for Business Park 95 Street Reconstructions, Improvement <br />Project #21-03. <br />Res 21-234 <br />IP 21-03 Change Order #1 <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Bruce Westby Bruce Westby 08/19/2021 10:17 AM <br />Kurt Ulrich Kurt Ulrich 08/19/2021 11:35 AM <br />Form Started By: Marsha Weidner Started On: 08/09/2021 09:11 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.