My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/24/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 08/24/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:07:01 PM
Creation date
9/30/2021 9:19:30 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/24/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of <br />RAMSEY <br />August 10, 2021 <br />Anoka County Administration <br />Rhonda Sivarajah, County Administrator <br />2100 3rd Avenue, STE 700 <br />Anoka, MN 55303 <br />County Administrator Sivarajah, <br />7550 Sunwood Drive NW • Ramsey, MN 55303 <br />City Hall: 763.427.1410 • Fax: 763.427.5543 <br />www.cityoframsey.com <br />Thank you for the opportunity to provide additional information about the TIF 18 (Oppidan <br />Industrial). This is an exciting project for the City of Ramsey and the region. The project <br />consists of three industrial buildings to be built in two phases. I have attached a site location <br />map and site plan depicting the proposed layout of the three buildings and their sizes. I have <br />included a list of relevant project benefits below. <br />Project Benefits Summary <br />• 100-150 new jobs for the City of Ramsey. At least 100 of the new jobs are anticipated to <br />be created paying a minimum wage of at least $17.50 per hour excluding benefits. <br />• Opportunity for employment for Ramsey and Anoka County Residents. <br />• Payment of required outstanding 2011 and 2017 special assessments for the extension of <br />Bunker Lake Boulevard and City Utilities (Bunker Lake Business Park / Puma <br />Street) attributable to the developed parcel will be made at time of proposed property <br />closing in September 2021. <br />• 42.7 Million Dollar private sector project investment. <br />• $1 M in annual property taxes after project is completed. The newly created local tax <br />revenue will be captured by the TIF District 18 for 9 years. <br />• The proposed 405,000 square foot manufacturing buildings are high -quality and market <br />relevant. This industrial complex will be the largest in Ramsey and be a significant <br />investment for the City's new Bunker Lake Industrial Park. <br />• The proposed funding sources for the subsidy request would be from a newly created TIF <br />District 18. Meaning, this subsidy will not have a direct impact on the existing general <br />tax levy and Ramsey taxpayers. Also, like any TIF project, the existing tax base remains <br />in place, 100%. <br />"00' <br />T <br />It is our mission to work together to responsibly grow our community, <br />and to provide quality, cost-effective, and efficient government services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.