|
57
<br />2504.603
<br />12" WATERMAIN DUCTILE IRON CLASS 52
<br />LF
<br />3,341
<br />$ 68.00
<br />$ 227,188.00 0 $ 40
<br />58
<br />59
<br />60
<br />2504.603
<br />2504.608
<br />2506.502
<br />12" WATERMAIN HDPE (DIRECTIONAL DRILLED)
<br />DUCTILE IRON FITTINGS
<br />CASTING ASSEMBLY (SANITARY)
<br />LF
<br />LBS
<br />EA
<br />1,204
<br />968
<br />7
<br />$ 72.10
<br />$ 6,35
<br />$ 801.00
<br />$ 86,808.40 0 $ 1,204
<br />$ 6,146.80 0 $ - 2,436
<br />$ 5,607.00
<br />0 $ 7
<br />$ 2,720.00
<br />$ 86,808.40
<br />$ 15,468.60
<br />$ 5,607.00
<br />61
<br />62
<br />2506.502
<br />2506.503
<br />ADJUST FRAME AND RING CASTING
<br />CONSTRUCT SANITARY STRUCTURE DESIGN 48-4007
<br />EA
<br />LF
<br />9
<br />98.3
<br />$ 439.00
<br />$ 306.00
<br />$ 3,951.00
<br />0 $ - 9
<br />$ 30,079.80 0.0 $ 98.0
<br />$ 3,951.00
<br />$ 29,988.00
<br />63
<br />2506.503
<br />CONSTRUCT SANITARY STRUCTURE DESIGN 60-4007
<br />LF
<br />23.9
<br />$ 747.00
<br />$ 17,853.30 0.0 $ 24.4
<br />$ 18,226.80
<br />64
<br />2506.602
<br />RESET CATCH BASIN CASTING
<br />EA
<br />2
<br />$ 366.00
<br />$ 732.00 0 $ 2
<br />$ 732.00
<br />65
<br />2506.603
<br />CONSTRUCT 15" INSIDE DROP
<br />LF
<br />15.0
<br />$ 592.00
<br />$ 8,880.00 0.0 $ 12.0
<br />$ 7,104.00
<br />66 2521.518
<br />6" CONCRETE WALK
<br />SF
<br />1,331
<br />$ 13.20
<br />$ 17,569.20 0 $ 1,267
<br />$ 16,724.40
<br />67
<br />68
<br />2531.503
<br />2531.504
<br />CONCRETE CURB & GUTTER DESIGN B418
<br />6" CONCRETE DRIVEWAY PAVEMENT
<br />LF
<br />SY
<br />580
<br />45
<br />$ 30.50
<br />$ 88.70
<br />$ 17,690.00 0 $ 564
<br />$ 3,991.50 0 $ 24
<br />$ 17,202.00
<br />$ 2,128.80
<br />69
<br />2531.504
<br />CONCRETE MEDIAN
<br />SY
<br />10
<br />$ 72.00
<br />$ 720.00 0 $ 11
<br />$ 792.00
<br />70
<br />2531.604
<br />CONCRETE DRAINAGE FLUME
<br />SY
<br />5
<br />$ 135.00
<br />$ 675.00 10 $ 1,350.00 10
<br />$ 1,350.00
<br />71
<br />2531.618
<br />TRUNCATED DOMES
<br />SF
<br />206
<br />$ 60.00
<br />$ 12,360.00 0 $ 200
<br />72
<br />2540.601
<br />LANDSCAPE RESTORATION
<br />LS
<br />1
<br />$ 3,490.00
<br />$ 3,490.00 0 $ 1
<br />73
<br />2540.602
<br />TEMPORARY MAIL BOX CLUSTER
<br />EA
<br />4
<br />$ 250.00
<br />$ 1,000.00 0 $ 2
<br />$ 12,000.00
<br />$ 3,490.00
<br />$ 500.00
<br />74
<br />2540.602
<br />INSTALL MAIL BOX SUPPORT
<br />EA
<br />12
<br />$ 75.00
<br />$ 900.00 0 $ 11
<br />$ 825.00
<br />75
<br />2563.601
<br />TRAFFIC CONTROL
<br />LS
<br />1
<br />$ 5,800.00
<br />$ 5,800.00 0.0 $ 1
<br />$ 5,800.00
<br />76
<br />2573.502
<br />STORM DRAIN INLET PROTECTION
<br />EA
<br />5
<br />$ 197.00
<br />$ 985.00 0 $ 4
<br />$ 788.00
<br />77
<br />2573.503
<br />SILT FENCE, TYPE MS
<br />LF
<br />13,255
<br />$ 1.80
<br />$ 23,859.00 2,611 $ 4,699.80 11,773
<br />$ 21,191.40
<br />78
<br />2573.503
<br />SEDIMENT CONTROL LOG TYPE STRAW
<br />LF
<br />1,795.0
<br />$ 2.40
<br />$ 4,308.00 200 $ 480.00 800
<br />$ 1,920.00
<br />79
<br />2574.507
<br />TOPSOIL (LV)
<br />CY
<br />1,992
<br />$ 33.70
<br />$ 67,130.40 114 $ 3,841.80 1,814
<br />$ 61,131.80
<br />80
<br />2574.508.
<br />FERTILIZER TYPE 3
<br />LBS
<br />555
<br />$ 0.53
<br />$ 294.15 175 $ 92.75 520
<br />$ 275.60
<br />81
<br />2575.504
<br />SODDING TYPE LAWN
<br />SY
<br />100
<br />$ 8.25
<br />$ 825.00 0 $ 0
<br />82
<br />2575.505
<br />SEEDING
<br />ACRE
<br />5.45
<br />$ 475.00
<br />$ 2,588.75 1.75 $ 831.25 5.20
<br />$ 2,470.00
<br />83
<br />84
<br />85
<br />86
<br />87
<br />88
<br />89
<br />2575.508
<br />2575.508
<br />2582.503
<br />2582.503
<br />2582.503
<br />' 2582.503
<br />2582.503
<br />SEED MIXTURE 25-151
<br />HYDRAULIC MUCLH MATRIX
<br />24" SOLID LINE PAINT (EPDXY)
<br />4" DOUBLE SOLID LINE PAINT (EPDXY)
<br />4" SOLID LINE PAINT (EPDXY)
<br />4" BROKEN LINE PAINT (EPDXY)
<br />4" DOTTED LINE PAINT (EPDXY)
<br />LBS
<br />LBS
<br />LF
<br />LF
<br />LF
<br />LF
<br />LF
<br />665
<br />21,800
<br />142
<br />2,825
<br />27,935
<br />1,860
<br />300
<br />$ 3.10
<br />$ 0.69
<br />$ 7.00
<br />$ 0.44
<br />$ 0.22
<br />$ 0.22
<br />$ 0.22
<br />$ 2,061.50 210 $ 651.00 624
<br />$ 15,042.00 7,000 $ 4,830.00 20,800
<br />$ 994.00 0 $ 67
<br />$ 1,243.00 460 $ 202.40 3,287
<br />$ 6,145.70 3,274 $ 720.28 31,529
<br />$ 409.20 0 $ - 2,530
<br />$ 66.00 0 $ - 0
<br />90
<br />91
<br />2582.518
<br />2582.518
<br />CROSSWALK PAINT (EPDXY)
<br />PAVEMENT MESSAGE PAINT (EPDXY)
<br />SF
<br />SF
<br />408.00
<br />124
<br />$ 5.00
<br />$ 6.43
<br />TOTAL BID
<br />$ 2,040.00 0 $ 504
<br />$ 797.32 3 $ 19.29 128
<br />$ 2,813,756.09
<br />$ 17,718.57
<br />$ 1,934.40
<br />$ 14,352.00'
<br />$ 469.00
<br />$ 1,446.28
<br />$ 6,936.38
<br />$ 556.60
<br />• $ 2,520.00
<br />$ 823.04
<br />$ 2,396,886.46
<br />ALTERNATE A
<br />Item
<br />No.
<br />MnDot
<br />No.
<br />Item Description
<br />Unit
<br />CONTRACT AMOUNT
<br />PAY THIS PERIOD
<br />PAID TO DATE
<br />Estimated
<br />Quantity
<br />Unit Price
<br />ExtensionQuantity
<br />Extension
<br />Quantity
<br />uantit
<br />Extension
<br />Al
<br />2565.616
<br />PEDESTRIAN CROSSWALK FLASHER SYSTEM
<br />SYS
<br />1
<br />$ 40,200.00
<br />$ 40,200.00
<br />0.0
<br />$ -
<br />I
<br />$ 40,200.00
<br />TOTAL BID
<br />$ 40,200.00
<br />$ -
<br />$ 40,200.00
<br />ALTERNATIVE B
<br />Item
<br />No.
<br />MnDot
<br />No.
<br />Item Description
<br />Unit
<br />CONTRACT AMOUNT
<br />PAY THIS PERIOD
<br />PAID TO DATE
<br />Estimated
<br />Quantity
<br />Unit Price
<br />Extension
<br />Quantity
<br />Extension
<br />Quantity
<br />Extension
<br />B 1
<br />2504.603
<br />12" WATERMAIN DUCTILE IRON CLASS 52
<br />LF
<br />-3,341
<br />$ 68.00
<br />$ (227,188.00)
<br />0
<br />$ -
<br />0
<br />$ -
<br />B2
<br />2504.603
<br />12" WATERMAIN HDPE (DIRECTIONAL DRILLED)
<br />LF
<br />3,341
<br />$ 55.40
<br />$ 185,091.40
<br />0
<br />$ -
<br />3,298
<br />$ 182,709.20
<br />TOTAL BID
<br />$ (42,096.60)_ $ -
<br />$ 182,709.20
<br />CHANGE ORDER No.1
<br />Item
<br />No.
<br />MnDot
<br />No.
<br />Item Description
<br />Unit
<br />CONTRACT AMOUNT
<br />PAY THIS PERIOD
<br />PAID TO DATE
<br />Estimated
<br />Quantity
<br />Unit Price
<br />Extension
<br />Quantity
<br />Extension
<br />Quantity
<br />Extension
<br />18
<br />2105.601
<br />ADDITIONAL DEWATERING
<br />LS
<br />1
<br />$ 11,985.00
<br />$ 11,985.00
<br />0
<br />$ -
<br />1
<br />$ 11,985.00
<br />42
<br />2503.503
<br />21" PVC PIPE SEWER (SDR 26)
<br />LF
<br />160
<br />$ 88.70
<br />$ 14,192.00
<br />0
<br />$ -
<br />177
<br />$ 15,699.90
<br />92
<br />2503.503
<br />4" PVC SANITARY SEWER SERVICE PIPE (SDR 26)
<br />LF
<br />58
<br />$ 42.00
<br />$ 2,436.00
<br />0
<br />$ -
<br />55
<br />$ 2,310.00
<br />93
<br />2503.602
<br />21" X 4" PVC WYE (SDR 26)
<br />EA
<br />1
<br />$ 2,292.00
<br />$ 2,292.00
<br />0
<br />$ -
<br />1
<br />$ 2,292.00
<br />94
<br />2503.602
<br />4" PVC CAP .
<br />EA
<br />1
<br />$ 50.00
<br />$ 50.00
<br />0
<br />$ -
<br />1
<br />$ 50.00
<br />46
<br />2503.603
<br />CLEAN AND VIDEO TAPE PIPE SEWER (SANITARY)
<br />LF
<br />160
<br />$ 1.40
<br />. $ 224.00
<br />0
<br />$ -
<br />117
<br />$ 163.80
<br />95
<br />2504.602
<br />1" CORPORATION STOP
<br />EA
<br />1
<br />$ 787.00
<br />$ 787.00�
<br />0
<br />$ -
<br />1
<br />$ 787.00
<br />96
<br />2504.602
<br />1" CURB STOP AND BOX
<br />EA
<br />1
<br />$ 768.00
<br />$ 768.00
<br />0
<br />$ -
<br />1
<br />$ 768.00
<br />97
<br />2504.603
<br />1" COPPER PIPE TYPE K
<br />LF
<br />75
<br />$ 43.00
<br />$ 3,225.00
<br />0
<br />$ -
<br />75
<br />$ 3,225.00
<br />60
<br />2506.502
<br />CASTING ASSEMBLY (SANITARY)
<br />EA
<br />1
<br />$ 801.00�
<br />$ 801.00
<br />0
<br />$ -
<br />1
<br />$ 801.00
<br />61
<br />2506.502
<br />ADJUST FRAME AND RING CASTING
<br />EA
<br />1
<br />$ 439.00
<br />$ 439.00
<br />0
<br />$ -
<br />1
<br />$ 439.00
<br />62
<br />2506.503
<br />CONSTRUCT SANITARY STRUCTURE DESIGN 48-4007
<br />LF
<br />20.3
<br />•
<br />$ 306.00
<br />$ 6,211.80
<br />0.0
<br />$ -
<br />19.9
<br />$ 6,089.40
<br />TOTAL BID
<br />$ 43,410.80
<br />$ -
<br />$ 44,610.10
<br />20-01 Variolite Street Reconstion
<br />Pay Estimate
<br />Page 3 of 3
<br />
|