Laserfiche WebLink
57 <br />2504.603 <br />12" WATERMAIN DUCTILE IRON CLASS 52 <br />LF <br />3,341 <br />$ 68.00 <br />$ 227,188.00 0 $ 40 <br />58 <br />59 <br />60 <br />2504.603 <br />2504.608 <br />2506.502 <br />12" WATERMAIN HDPE (DIRECTIONAL DRILLED) <br />DUCTILE IRON FITTINGS <br />CASTING ASSEMBLY (SANITARY) <br />LF <br />LBS <br />EA <br />1,204 <br />968 <br />7 <br />$ 72.10 <br />$ 6,35 <br />$ 801.00 <br />$ 86,808.40 0 $ 1,204 <br />$ 6,146.80 0 $ - 2,436 <br />$ 5,607.00 <br />0 $ 7 <br />$ 2,720.00 <br />$ 86,808.40 <br />$ 15,468.60 <br />$ 5,607.00 <br />61 <br />62 <br />2506.502 <br />2506.503 <br />ADJUST FRAME AND RING CASTING <br />CONSTRUCT SANITARY STRUCTURE DESIGN 48-4007 <br />EA <br />LF <br />9 <br />98.3 <br />$ 439.00 <br />$ 306.00 <br />$ 3,951.00 <br />0 $ - 9 <br />$ 30,079.80 0.0 $ 98.0 <br />$ 3,951.00 <br />$ 29,988.00 <br />63 <br />2506.503 <br />CONSTRUCT SANITARY STRUCTURE DESIGN 60-4007 <br />LF <br />23.9 <br />$ 747.00 <br />$ 17,853.30 0.0 $ 24.4 <br />$ 18,226.80 <br />64 <br />2506.602 <br />RESET CATCH BASIN CASTING <br />EA <br />2 <br />$ 366.00 <br />$ 732.00 0 $ 2 <br />$ 732.00 <br />65 <br />2506.603 <br />CONSTRUCT 15" INSIDE DROP <br />LF <br />15.0 <br />$ 592.00 <br />$ 8,880.00 0.0 $ 12.0 <br />$ 7,104.00 <br />66 2521.518 <br />6" CONCRETE WALK <br />SF <br />1,331 <br />$ 13.20 <br />$ 17,569.20 0 $ 1,267 <br />$ 16,724.40 <br />67 <br />68 <br />2531.503 <br />2531.504 <br />CONCRETE CURB & GUTTER DESIGN B418 <br />6" CONCRETE DRIVEWAY PAVEMENT <br />LF <br />SY <br />580 <br />45 <br />$ 30.50 <br />$ 88.70 <br />$ 17,690.00 0 $ 564 <br />$ 3,991.50 0 $ 24 <br />$ 17,202.00 <br />$ 2,128.80 <br />69 <br />2531.504 <br />CONCRETE MEDIAN <br />SY <br />10 <br />$ 72.00 <br />$ 720.00 0 $ 11 <br />$ 792.00 <br />70 <br />2531.604 <br />CONCRETE DRAINAGE FLUME <br />SY <br />5 <br />$ 135.00 <br />$ 675.00 10 $ 1,350.00 10 <br />$ 1,350.00 <br />71 <br />2531.618 <br />TRUNCATED DOMES <br />SF <br />206 <br />$ 60.00 <br />$ 12,360.00 0 $ 200 <br />72 <br />2540.601 <br />LANDSCAPE RESTORATION <br />LS <br />1 <br />$ 3,490.00 <br />$ 3,490.00 0 $ 1 <br />73 <br />2540.602 <br />TEMPORARY MAIL BOX CLUSTER <br />EA <br />4 <br />$ 250.00 <br />$ 1,000.00 0 $ 2 <br />$ 12,000.00 <br />$ 3,490.00 <br />$ 500.00 <br />74 <br />2540.602 <br />INSTALL MAIL BOX SUPPORT <br />EA <br />12 <br />$ 75.00 <br />$ 900.00 0 $ 11 <br />$ 825.00 <br />75 <br />2563.601 <br />TRAFFIC CONTROL <br />LS <br />1 <br />$ 5,800.00 <br />$ 5,800.00 0.0 $ 1 <br />$ 5,800.00 <br />76 <br />2573.502 <br />STORM DRAIN INLET PROTECTION <br />EA <br />5 <br />$ 197.00 <br />$ 985.00 0 $ 4 <br />$ 788.00 <br />77 <br />2573.503 <br />SILT FENCE, TYPE MS <br />LF <br />13,255 <br />$ 1.80 <br />$ 23,859.00 2,611 $ 4,699.80 11,773 <br />$ 21,191.40 <br />78 <br />2573.503 <br />SEDIMENT CONTROL LOG TYPE STRAW <br />LF <br />1,795.0 <br />$ 2.40 <br />$ 4,308.00 200 $ 480.00 800 <br />$ 1,920.00 <br />79 <br />2574.507 <br />TOPSOIL (LV) <br />CY <br />1,992 <br />$ 33.70 <br />$ 67,130.40 114 $ 3,841.80 1,814 <br />$ 61,131.80 <br />80 <br />2574.508. <br />FERTILIZER TYPE 3 <br />LBS <br />555 <br />$ 0.53 <br />$ 294.15 175 $ 92.75 520 <br />$ 275.60 <br />81 <br />2575.504 <br />SODDING TYPE LAWN <br />SY <br />100 <br />$ 8.25 <br />$ 825.00 0 $ 0 <br />82 <br />2575.505 <br />SEEDING <br />ACRE <br />5.45 <br />$ 475.00 <br />$ 2,588.75 1.75 $ 831.25 5.20 <br />$ 2,470.00 <br />83 <br />84 <br />85 <br />86 <br />87 <br />88 <br />89 <br />2575.508 <br />2575.508 <br />2582.503 <br />2582.503 <br />2582.503 <br />' 2582.503 <br />2582.503 <br />SEED MIXTURE 25-151 <br />HYDRAULIC MUCLH MATRIX <br />24" SOLID LINE PAINT (EPDXY) <br />4" DOUBLE SOLID LINE PAINT (EPDXY) <br />4" SOLID LINE PAINT (EPDXY) <br />4" BROKEN LINE PAINT (EPDXY) <br />4" DOTTED LINE PAINT (EPDXY) <br />LBS <br />LBS <br />LF <br />LF <br />LF <br />LF <br />LF <br />665 <br />21,800 <br />142 <br />2,825 <br />27,935 <br />1,860 <br />300 <br />$ 3.10 <br />$ 0.69 <br />$ 7.00 <br />$ 0.44 <br />$ 0.22 <br />$ 0.22 <br />$ 0.22 <br />$ 2,061.50 210 $ 651.00 624 <br />$ 15,042.00 7,000 $ 4,830.00 20,800 <br />$ 994.00 0 $ 67 <br />$ 1,243.00 460 $ 202.40 3,287 <br />$ 6,145.70 3,274 $ 720.28 31,529 <br />$ 409.20 0 $ - 2,530 <br />$ 66.00 0 $ - 0 <br />90 <br />91 <br />2582.518 <br />2582.518 <br />CROSSWALK PAINT (EPDXY) <br />PAVEMENT MESSAGE PAINT (EPDXY) <br />SF <br />SF <br />408.00 <br />124 <br />$ 5.00 <br />$ 6.43 <br />TOTAL BID <br />$ 2,040.00 0 $ 504 <br />$ 797.32 3 $ 19.29 128 <br />$ 2,813,756.09 <br />$ 17,718.57 <br />$ 1,934.40 <br />$ 14,352.00' <br />$ 469.00 <br />$ 1,446.28 <br />$ 6,936.38 <br />$ 556.60 <br />• $ 2,520.00 <br />$ 823.04 <br />$ 2,396,886.46 <br />ALTERNATE A <br />Item <br />No. <br />MnDot <br />No. <br />Item Description <br />Unit <br />CONTRACT AMOUNT <br />PAY THIS PERIOD <br />PAID TO DATE <br />Estimated <br />Quantity <br />Unit Price <br />ExtensionQuantity <br />Extension <br />Quantity <br />uantit <br />Extension <br />Al <br />2565.616 <br />PEDESTRIAN CROSSWALK FLASHER SYSTEM <br />SYS <br />1 <br />$ 40,200.00 <br />$ 40,200.00 <br />0.0 <br />$ - <br />I <br />$ 40,200.00 <br />TOTAL BID <br />$ 40,200.00 <br />$ - <br />$ 40,200.00 <br />ALTERNATIVE B <br />Item <br />No. <br />MnDot <br />No. <br />Item Description <br />Unit <br />CONTRACT AMOUNT <br />PAY THIS PERIOD <br />PAID TO DATE <br />Estimated <br />Quantity <br />Unit Price <br />Extension <br />Quantity <br />Extension <br />Quantity <br />Extension <br />B 1 <br />2504.603 <br />12" WATERMAIN DUCTILE IRON CLASS 52 <br />LF <br />-3,341 <br />$ 68.00 <br />$ (227,188.00) <br />0 <br />$ - <br />0 <br />$ - <br />B2 <br />2504.603 <br />12" WATERMAIN HDPE (DIRECTIONAL DRILLED) <br />LF <br />3,341 <br />$ 55.40 <br />$ 185,091.40 <br />0 <br />$ - <br />3,298 <br />$ 182,709.20 <br />TOTAL BID <br />$ (42,096.60)_ $ - <br />$ 182,709.20 <br />CHANGE ORDER No.1 <br />Item <br />No. <br />MnDot <br />No. <br />Item Description <br />Unit <br />CONTRACT AMOUNT <br />PAY THIS PERIOD <br />PAID TO DATE <br />Estimated <br />Quantity <br />Unit Price <br />Extension <br />Quantity <br />Extension <br />Quantity <br />Extension <br />18 <br />2105.601 <br />ADDITIONAL DEWATERING <br />LS <br />1 <br />$ 11,985.00 <br />$ 11,985.00 <br />0 <br />$ - <br />1 <br />$ 11,985.00 <br />42 <br />2503.503 <br />21" PVC PIPE SEWER (SDR 26) <br />LF <br />160 <br />$ 88.70 <br />$ 14,192.00 <br />0 <br />$ - <br />177 <br />$ 15,699.90 <br />92 <br />2503.503 <br />4" PVC SANITARY SEWER SERVICE PIPE (SDR 26) <br />LF <br />58 <br />$ 42.00 <br />$ 2,436.00 <br />0 <br />$ - <br />55 <br />$ 2,310.00 <br />93 <br />2503.602 <br />21" X 4" PVC WYE (SDR 26) <br />EA <br />1 <br />$ 2,292.00 <br />$ 2,292.00 <br />0 <br />$ - <br />1 <br />$ 2,292.00 <br />94 <br />2503.602 <br />4" PVC CAP . <br />EA <br />1 <br />$ 50.00 <br />$ 50.00 <br />0 <br />$ - <br />1 <br />$ 50.00 <br />46 <br />2503.603 <br />CLEAN AND VIDEO TAPE PIPE SEWER (SANITARY) <br />LF <br />160 <br />$ 1.40 <br />. $ 224.00 <br />0 <br />$ - <br />117 <br />$ 163.80 <br />95 <br />2504.602 <br />1" CORPORATION STOP <br />EA <br />1 <br />$ 787.00 <br />$ 787.00� <br />0 <br />$ - <br />1 <br />$ 787.00 <br />96 <br />2504.602 <br />1" CURB STOP AND BOX <br />EA <br />1 <br />$ 768.00 <br />$ 768.00 <br />0 <br />$ - <br />1 <br />$ 768.00 <br />97 <br />2504.603 <br />1" COPPER PIPE TYPE K <br />LF <br />75 <br />$ 43.00 <br />$ 3,225.00 <br />0 <br />$ - <br />75 <br />$ 3,225.00 <br />60 <br />2506.502 <br />CASTING ASSEMBLY (SANITARY) <br />EA <br />1 <br />$ 801.00� <br />$ 801.00 <br />0 <br />$ - <br />1 <br />$ 801.00 <br />61 <br />2506.502 <br />ADJUST FRAME AND RING CASTING <br />EA <br />1 <br />$ 439.00 <br />$ 439.00 <br />0 <br />$ - <br />1 <br />$ 439.00 <br />62 <br />2506.503 <br />CONSTRUCT SANITARY STRUCTURE DESIGN 48-4007 <br />LF <br />20.3 <br />• <br />$ 306.00 <br />$ 6,211.80 <br />0.0 <br />$ - <br />19.9 <br />$ 6,089.40 <br />TOTAL BID <br />$ 43,410.80 <br />$ - <br />$ 44,610.10 <br />20-01 Variolite Street Reconstion <br />Pay Estimate <br />Page 3 of 3 <br />