Laserfiche WebLink
September 10, 2021 <br />Page 4 <br />List of Figures <br />Figure 1: Existing Mississippi River Crossings in the Northwest Twin Cities Metropolitan Area 6 <br />Figure 2: Projected Increase in Households in Northwest Metro Cities 11 <br />Figure 3: Future Land Use in the Northwest Metro 12 <br />Figure 4: Future Vehicle Transportation Network in the Northwest Metro 13 <br />Figure 5: Origin -Destination Analysis Summary of Trips Crossing the Mississippi River 15 <br />Figure 6: Median and Range of Daily Trips on Northwest Metro Mississippi River Crossings 17 <br />Figure 7: Origin and Destination of Trips Crossing the Mississippi River on Highway 101, by TAZ 19 <br />Figure 8: Origin and Destination of Trips Crossing the Mississippi River on Highway 169, by TAZ 20 <br />Figure 9: Origin and Destination of Trips Crossing the Mississippi River on Highway 610, by TAZ 21 <br />Figure 10: Highway 101 Bridge Long -Distance Holiday Trips 22 <br />Figure 11: Hours of Congestion on a Typical Workday 24 <br />Figure 12: AM Peak Hour Congestion and Issues 26 <br />Figure 13: PM Peak Hour Congestion and Issues 27 <br />Figure 14: Highway 101 Mississippi River Crossing Congestion 29 <br />Figure 15: Constructed and Programmed Projects -- 2021 31 <br />Figure 16: Range of Possible Improvements on Highway Corridors in the Northwest Metro 32 <br />Figure 17: Highway 10-A1: At -Grade Improvements 36 <br />Figure 18: Highway 10-A2: Grade -Separated Corridor 37 <br />Figure 19: Highway 10-A2: Lane Addition 38 <br />Figure 20: Highway 101-A1: Diverging Diamond Conversion 39 <br />Figure 21: Highway 101-A2: SB Highway 101 Flyover to EB I-94 40 <br />Figure 22: Highway 610 — Al: Mobility Improvement 41 <br />Figure 23: Planning -Level Capacity Needs for New River Crossing 42 <br />Figure 24: Four -Lane Arterial Conceptual Section 43 <br />Figure 25: Four -Lane Expressway Conceptual Section 43 <br />Figure 26: Concept 1— Mobility Improvements on Highway 10 and Highway 101 45 <br />Figure 27: Concept 2 — Mobility Improvements on Highway 10, Highway 101, and Highway 610 46 <br />Figure 28: Concept 3 — Four -lane Arterial Following Zanzibar/Armstrong Alignment 47 <br />Figure 29: Concept 4 — Four -lane Arterial Following Zanzibar/Armstrong Alignment 48 <br />Figure 30: Year 2040 Traffic Volumes Under No -Build Scenario 51 <br />Figure 31: Concept 1 Impacts on Regional Traffic Volumes 52 <br />Figure 32: Concept 2 Impacts on Regional Traffic Volumes 53 <br />Figure 33: Concept 3 Impacts on Regional Traffic Volumes 54 <br />Figure 34: Concept 4 Impacts on Regional Traffic Volumes 55 <br />Figure 35: Congestion 2018 vs 2040 No -Build (AM Peak) 56 <br />Figure 36: I-94/Hwy 101 I nterchange 69 <br />Figure 37: I-94/Hwy 101 I nterchange — Condition 1 (DDI) 70 <br />Figure 38: I-94/Hwy 101 I nterchange — Condition 2 (Flyover) 70 <br />Figure 39: I-94/Hwy 101 Intersection Delay; AM Peak Hour 71 <br />Figure 40: I-94/Hwy 101 Intersection Delay; PM Peak Hour 71 <br />Figure 41: I-94/Hwy 101 Intersection Delay with Increased Telecommuting; AM Peak Hour 72 <br />Figure 42: I-94/Hwy 101 Intersection Delay with Increased Telecommuting; PM Peak Hour 72 <br />Figure 43: I-94/Dayton Parkway Interchange 73 <br />Figure 44: I-94/Dayton Parkway Intersection Delay; AM Peak Hour — Existing Geometry 74 <br />Figure 45: I-94/Dayton Parkway Intersection Delay; PM Peak Hour — Existing Geometry 74 <br />Figure 46: I-94/Dayton Parkway Intersection Delay; AM Peak Hour — Improved Geometry 75 <br />Northwest Metro Mississippi River Crossing Feasibility Analysis <br />