My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 10/12/2021
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2021
>
Agenda - Council Work Session - 10/12/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:15:13 PM
Creation date
10/8/2021 9:35:33 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
10/12/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 11, 2021 <br />Page 38 <br />Highway 10-B: Lane Addition <br />Highway 10-B is the construction of a third lane in each direction of Segment B. The cost estimate <br />was previously completed by Anoka County, which includes the construction of an outside lane and <br />shoulder with associated grading, retaining walls, minor interchange modifications, and noise walls. <br />Figure 19: Highway 10-A2: Lane Addition <br />m <br />DEPARTMENT OF <br />TRANSPORTATION <br />NORTHWEST METRO <br />Mississippi River Crossings <br />Feasibility Analysis <br />CONCEPT DEVEL P ENI <br />USTH 10 - B <br />Lane Addition <br />Existing bridge requires <br />TT-1-1-11 no modifications to <br />accommodate this concept <br />Tie -ire to <br />Round Lake <br />Blvd ramps <br />L J <br />Anoka County is <br />currently leading the <br />design of this project. <br />USTH 10 - Lane add typical section <br />Addition of <br />third lane <br />Addition of <br />third lane <br />Northwest Metro Mississippi River Crossing Feasibility Analysis <br />
The URL can be used to link to this page
Your browser does not support the video tag.