Laserfiche WebLink
m <br />DEPARTMENT OF <br />TRANSPORTATION <br />NORTHWEST METRO <br />Mississippi River Crossings: Improvement Concepts <br />Overview and Need <br />Context and Land Use Traffic Analysis <br />Improvement Concepts <br />Next Steps <br />Improvement Concept Overview <br />Improvement concepts were conceived throughout the study area to address mobility concerns <br />identified in the traffic analysis. The improvements were meant to address bottlenecks and congestion <br />on existing highways either through spot mobility or strategic capacity. In addition, several new options <br />for Mississippi River crossing connections concepts were also explored. All of the improvements were <br />evaluated with respect to the following factors: <br />Potential for residential & <br />community impacts <br />Improves traffic flow across <br />Mississippi River <br />Consistent with local & <br />regional planning <br />Possible natural <br />resources impacts <br />Improvements that performed well across these factors were included in concept development. A concept <br />graphic was created for each improvement to convey the location and type of improvement. The range <br />of concepts were reviewed by the MNDOT team and then shared with project stakeholders including city <br />and county staff and elected officials. Based on the traffic analysis and input received, the concepts were <br />revised and narrowed to the four identified in the following pages. <br />The concepts identified included a range of improvements with different magnitudes of costs and mobility <br />benefits. Additional project development, technical analysis and public participation will be required to <br />fully determine what, if any, improvements should be constructed. The planning -level improvements <br />considered in each location are illustrated on the following pages. <br />page 14 <br />