September 11, 2021 <br />Page 90 <br />o The I-94/Armstrong Boulevard interchange operates under year 2040 no -build conditions <br />in the telecommute Concept 3/4 build scenario, but delay caused by increased traffic <br />volumes can be mitigated with improved interchange geometry. <br />o The Highway 169 river crossing remains highly congested under the year 2040 <br />telecommute no -build scenario; Concept 3/4 reduces congestion under both traditional <br />and telecommuting forecasts. <br />Northwest Metro Mississippi River Crossing Feasibility Analysis <br />