Laserfiche WebLink
EL Rem ov ((Jcins <br />15688 Jarvis St NW <br />Elk River, MN 55330 <br />Phone (763) 427-6100 <br />www.ehrenner.com <br />License: 1431 <br />LOWELL VASSEUR <br />8106 ALPINE DRIVE <br />RAMSEY, MN 55303 <br />ESTMATE <br />Date 7/7/2021 <br />Estimator: KATHRYNN RENNER <br />m mutt •um RA litowtoor <br />Estimate # 3464 <br />Page 1 of 3 <br />Job Location: <br />8106 Alpine Drive, RAMSEY <br />Customer Job/Well # REPLACEMENT W <br />A 4 inch diameter, STEEL cased well drilled 200 feet deep. 100 bags of neat cement installed between the well <br />casing and drilled borehole. 3 hours of development. 2 hours of test pumping. A Baker Snappy pitless adapter. <br />40 feet of 1-1/4 inch polyethylene water pipe and #12/3 wlgrd UF wire buried frost free. A Franklin 3/4 HP, 16 <br />GPM, 230V, pumping system. 63 feet of 1-1/4 inch drop pipe and #12/3 wlgrd submersible cable for the pump. A <br />50 gallon bladder type pressure tank fitted with: pressure switch, pressure guage, and miscellaneous fittings <br />installed and adjusted. The state well notification fee, state well record, and water quality analysis are also <br />included. <br />Variable Costs and Options: <br />1. For more or less well depth, Add or Deduct... <br />2. For more or less neat cement to seal the outside of the well casing, Add or Deduct... <br />3. For bentonite grout to seal the outside of the well casing, Add... <br />4. For more or less drop pipe and submersible cable for the pump, Add or Deduct... <br />$11.00/ft <br />5. For more or less polyethylene water pipe and UF wire buried frost free, Add or Deduct... <br />(Includes polyethylene water pipe, UF wire, and excavation) <br />6. For more or less polyethylene water pipe and UF wire directionally drilled, Add or Deduct... <br />(minimum charge of 100 feet applies) <br />7. For a Grundfos HP, 15 GPM, variable speed system (constant pressure), Add... <br />8. For a Grundfos 1 HP, 22 GPM, variable speed system (constant pressure), Add... <br />9. For a Grundfos 1.5 HP, 22 GPM, variable speed system (constant pressure), Add... <br />$1180.00 <br />10. Traction mat rentals, Add... <br />11. For more or less test pumping time, Add or Deduct... <br />12. For more or less development time, Add or Deduct... <br />Estimate based on the following: <br />$32.00/ft <br />$20.00/bg <br />$33.00/bg <br />$21.00/ft <br />$18.00/ft <br />$750,00 <br />$925.00 <br />$10.00/matiday <br />$200.00/hr <br />$200.00/hr <br />Total $18,161.36 <br />BY SIGNING YOU ACCEPT AND UNDERSTAND THE TOTAL ESTIMATED COST AND TERMS AND <br />CONDI S. <br />pted Date <br />