Trott Brook Crossing EAW August 2021 <br />It is anticipated that construction of the development will start in April of 2022 and be phased over <br />approximately seven years, depending on market conditions. Sanitary sewer will be extended from <br />Nowthen Blvd NW. Construction will generally be phased from the east to the west based on market <br />demand. The number of phases will be determined by market demand and absorption. Infrastructure <br />will be installed at the initiation of each construction phase. In most cases, streets, water main, and <br />sanitary sewer will only be installed to serve the upcoming phase of construction. Stormwater basins <br />will be created at the start of each construction phase to treat stormwater and minimize potential <br />effects of stormwater runoff. <br />c. Project magnitude: <br />Table 1. Project Magnitude <br />Characteristic <br />Number of Units <br />Total Project Acreage <br />200.5 <br />Linear project length <br />N/A <br />Number and type of residential units <br />As many as 275 single- <br />family detached <br />Commercial building area (square feet) <br />0 <br />Industrial building area (square feet) <br />0 <br />Institutional building area (square feet) <br />0 <br />Other uses —specify (acres) <br />N/A <br />Structure height(s) (feet) <br />20-35 <br />d. Explain the project purpose; if the project will be carried out by a governmental unit, explain the need for <br />the project and identify its beneficiaries. <br />The purpose of the Trott Brook Crossing is to provide a single-family residential development in the <br />City of Ramsey to meet market demand, in proximity to transportation corridors and open spaces. <br />The project will be carried out by a private entity. <br />e. Are future stages of this development including development on any other property planned or likely to <br />happen? ❑ Yes CC No <br />If yes, briefly describe future stages, relationship to present project, timeline and plans for environmental <br />review. <br />Future stages are not planned or likely. <br />f Is this project a subsequent stage of an earlier project? ❑ Yes Cl No <br />If yes, briefly describe the past development, timeline and any past environmental review. <br />The project is not a subsequent stage of an earlier project. <br />7. Cover Types <br />Estimate the acreage of the site with each of the following cover types before and after development: <br />3 <br />