Laserfiche WebLink
1.0 INTRODUCTION <br />1.1 Project Description <br />The Excelsior Group is proposing Tamarack Land Development (Tamarack) is preparing for <br />construction of the Trott Brook Property residential development located west of Nowthen <br />Boulevard and north of Trott Brook in Ramsey, Minnesota. We understand the development <br />will include preparing lots and house pads for about 270 single-family homes along with the <br />associated streets(s), underground utilities and stormwater pond(s). <br />1.2 Purpose <br />The Excelsior Group retained Haugo GeoTechnical Services, LLC (HGTS) to perform a <br />geotechnical exploration to evaluate the suitability of site soil and groundwater conditions to <br />support the anticipated residential structures, roadways and underground utilities and <br />provide recommendation for foundation and pavement design and construction. <br />1.3 Site Description <br />The project site is located west of Nowthen Boulevard and north of Trott Brook in Ramsey, <br />Minnesota. The overall property is approximately 200 acres with delineated wetlands, <br />dedicated parks and street Right of Ways accounting for about 73 acres yielding about 123 <br />acres of developable land. Except for the wetlands, the majority of the site existed as <br />agricultural lands with wooded areas. <br />The site topography varied with the ground surface elevations at the soil boring locations <br />ranging from about 875 to 903 feet above mean sea level (MSL). <br />1.4 Scope of Services <br />Our services were performed in accordance with the Haugo GeoTechnical Services proposal <br />21-0429 dated April 8, 2021. Our scope of services was performed under the terms of our <br />General Conditions and limited to the following tasks: <br />• Completing twelve (12) standard penetration test soil borings and extending each to <br />nominal depths of 20 feet. <br />• Installing 3 piezometers and constructing them in accordance with Minnesota <br />Department of Health (MDH) requirements. <br />• Removing the piezometers and sealing the boreholes, upon completion of water level <br />monitoring, in accordance with MDH requirements. <br />• Obtaining GPS coordinates and ground surface elevations at the soil boring locations. <br />• Visually/manually classifying samples recovered from the soil borings. <br />• Performing laboratory tests on selected samples. <br />• Preparing soil boring logs describing the materials encountered and the results of <br />groundwater level measurements. <br />• Preparing an engineering report describing current soil and groundwater conditions <br />and providing recommendations for foundation design and construction. <br />1 <br />