My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/14/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 09/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:08:59 PM
Creation date
10/22/2021 12:12:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/14/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
965
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
zoning, in accordinance with the Comprehensive Plan, or a property owner can request a change. In this instance, <br />the current owners of the Subject Properties would have to initiate a Zoning Amendment request for the zoning to <br />be changed. <br />Conformity with City Code <br />The proposed preliminary plat generally meets all of the requirements of City Code. There are a few minor changes <br />that will be required, as is typical with any sketch plan, preliminary plat, or subdivision application. The <br />Preliminary Plat appears to meet all of the requirements for the R-1 MUSA District, including all lots being 80 feet <br />wide and at least a quarter acre in size. <br />Future City Council Meeting <br />In the near future, the Preliminary Plat will need to have a motion made upon, but Staff thought it would be <br />beneficial to present the case first as an introduction, and then bring to a future meeting for a decision to be made. <br />Key Staff Comments <br />• Wetlands and Floodplain: All wetlands will be delineated and approved by the Lower Rum River Watershed <br />Management Organization, which will also need to issue a permit in order for work to start onsite. All <br />floodplain will also need to be shown on the plat sheets. Wetlands will be encumbered by a 16.5 foot buffer <br />easement. The City of Ramsey can require as-builts with any new home that is built in the City. Based on the <br />sensitive environmental nature and potential increase to insurance associated with owning a property by the <br />floodplain, Staff will require as-builts for all of these lots. <br />• Utilities: The City enlisted Bolton and Menk to prepare an Infrastructure Study for the general planning area <br />of Trott Brook North, north of the Brook, and between Variolite St and Nowthen Blvd. The Infrastructure <br />Study includes this property. The infrastructure study shows that this site could develop independently from <br />the properties to the south, however, it is much more likely that they will develop in tandem due to the large <br />costs associated with developing the site alone. Trunk utilities will need to be brought to this site in order for <br />it to develop. <br />• Sidewalks and Trails: The City requires a sidewalk on every side of a public street. Additionally, the City <br />will require a trail along Nowthen Blvd, 173rd Avenue, and 175th Avenue. Since 175th Avenue is likely to <br />be reconstructed in the future, or potentially realigned, the developer has the option to pay into the trail fund <br />or build the trail along 175th Avenue. Additionally, there will need to be a pedestrian crossing on 173rd <br />Avenue. <br />• Roads:173rd Avenue will need to be upgraded to a full public road as part of this project. The Applicant is <br />working with the Applicant to the south coordinating on this item. It is likely that there will be a cost -share <br />agreement outlined as part of road project, which will be discussed with the Applicant of the project to the <br />south and City Council. Additionally, the City Council has directed any project in this area to include turn <br />lanes into the project off Nowthen Blvd. Nowthen Blvd is a County Road, so any changes must be approved <br />by Anoka County, and a light would not be feasible for this site. <br />• The project to the south has completed a traffic study as part of their required EAW, which can be <br />found on the project website. Staff has included the traffic study (attached), which studied nearby <br />intersections. Staff has not fully reviewed the EAW at this time, but notes that it includes both a no <br />build scenario (no improvements to Nowthen or other roads) and a scenario that includes a turn lane <br />into the site off Nowthen Blvd. This study takes into account both projects at full build -out. <br />• Lot Sizes and Alignments: All of the proposed lots are 80 foot wide lots, proposed outside of the large gas <br />easement on the property. There is additional landscaping proposed along the western boundary with existing <br />residential lots. The existing home on the SE lot will be removed as part of this project. <br />• Timing: Based on the time of year, and need to get trunk utilities (sewer and water) to the Subject Properties, <br />it is very unlikely there will be any homes built onsite this year. There may be some preliminary grading <br />(moving dirt) on the Subject Properties this year. <br />Platting Process <br />1. Sketch Plan - Identify red flags and direct the Applicant on moving forward to Preliminary Plat <br />2. Preliminary Plat - Engineering documents, formal public hearing, if approved, the project has entitlement (we <br />are here) <br />
The URL can be used to link to this page
Your browser does not support the video tag.