Laserfiche WebLink
Construct an alternative access road and vacate easement. <br />Attached is a figure showing the existing 24-foot wide temporary park access road and connecting water tower <br />driveway shaded in red, as well as the proposed 24-foot wide park access road shaded in magenta. Existing utilities <br />are included in the figure, which include Zayo fiberoptics, CenterPoint gas, Connexus electric, and Comcast and <br />CenturyLink telecommunications lines. At a minimum these utilities serve the adjacent private properties, as well as <br />the buildings and water tower in Elmcrest Park. The private utilities were field located and surveyed so their <br />positioning on this figure is generally accurate. <br />The estimated project cost for removing the existing road and driveway and constructing the proposed road totals <br />$214,000. This estimated project cost includes 10-percent contingency costs and 23-percent indirect costs. Staff <br />does not anticipate the City would be responsible for paying to relocate the private utilities, but we also do not <br />know if any private agreements were executed with private property owners. As noted below, if the City does need <br />to pay to relocate utilities it could cost the City up to $70,000 to do so. <br />Funding Source: <br />Purchase of the park land and access, and access to the water tower can come from various funding sources <br />including park dedication and water enterprise funds. <br />Recommendation: <br />Staff recommend seeking a price from the underlying land owner for purchase of the property and identifying <br />appropriate funding based upon the price and purpose of the land. <br />Outcome/Action: <br />Consensus of Council direction to staff based upon discussion. <br />Road Alternative <br />Site Location Aerial <br />Access Easement <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Kurt Ulrich Kurt Ulrich 11/04/2021 05 : 3 5 PM <br />Form Started By: Kathy Schmitz Started On: 11/04/2021 01:34 PM <br />Final Approval Date: 11/04/2021 <br />