My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 09/21/2021
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2021
>
Agenda - Public Works Committee - 09/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:34:32 AM
Creation date
11/18/2021 8:39:54 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
09/21/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Anoka County Improvement Projects <br /> •Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive <br /> •Anoka County received$1.35M in HSIP funds (est. project cost= $1.5M) <br /> •Anoka County and City of Ramsey share is $150,000 each(per$1.5M est.) <br /> •Construction proposed for 2023,pending City&County approvals <br /> •Anoka County presented project at July 27 City Council work session <br /> •Anoka County is preparing preliminary plans <br /> • CSAH 116 Interim Improvements <br /> •Adding right turn lane on Sunwood Dr west of Bunker Lk Blvd <br /> •Forest Lake Contracting awarded contract <br /> •Construction in progress <br /> • CSAH 116 & TH 47 Intersection Improvements <br /> •Construction completion anticipated fall 2021 <br /> MnDOT Improvement Projects <br /> •US 10/169 &Ferry Street/TH 47 Interchange <br /> •Construction proposed 2022—2023 <br /> •Ferry Street/Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br /> o Preliminary design on hold <br /> o MnDOT exploring realignment of Highway 47 to remove S-curve <br /> o Tentatively proposed for construction in 2024 or later— Update attached <br /> •Rum River Bridge Replacement <br /> •Construction proposed 2022—2023 <br /> •Proposing three lanes between Highway 47 and 7th Street <br /> Studies &Items of Interest <br /> •5805 148th Lane NW <br /> •Meeting with property owner 9 AM on Wednesday, 9/22 <br /> •More detailed update to be presented at October 19 PWC meeting <br /> •Anoka Solution Highway 10 Improvements <br /> •Construction proposed 2022—2023 <br /> •Ramsey Gateway Highway 10 Improvements <br /> •Preliminary design in progress <br /> •Fully funded <br /> •NW Metro Mississippi River Crossing Feasibility Analysis <br /> •Updates to be presented in September <br /> •Reduced Speed Limits on Local Streets <br /> •No new requests received since last discussed <br /> • Staff continues to monitor actions in other cities <br /> Timeframe: <br /> Staff estimates up to 10 minutes will be needed for updates and discussion. <br /> Observations/Alternatives: <br /> NA <br /> Funding Source: <br /> NA <br /> Recommendation: <br /> NA <br />
The URL can be used to link to this page
Your browser does not support the video tag.