Laserfiche WebLink
• CSAH 116 & TH 47 Intersection Improvements <br />• Construction complete <br />MnDOT Improvement Projects <br />• US 10 / 169 & Ferry Street / TH 47 Interchange <br />• Construction proposed 2022 — 2023 <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />o Preliminary design on hold <br />o MnDOT exploring realignment of Highway 47 to remove S-curve <br />o $45M in bonds authorized October 2020 <br />o Tentatively proposed for construction in 2024 or later <br />• Rum River Bridge Replacement <br />• Construction proposed 2022 — 2023 <br />• Proposing three lanes between Highway 47 and 7th Street <br />Studies & Items of Interest <br />• 5805 148th Lane NW <br />• On -going <br />• FYA Improvements at Sunwood Drive and Ramsey Boulevard <br />• SEH completing Feasibility Analysis <br />• TH 47 Safety Study <br />• Update to be provided by City Engineer Westby <br />• Elk River Highway 10 Study <br />• Update to be provided by City Engineer Westby <br />• Anoka Solution Highway 10 Improvements <br />• Construction proposed 2022 — 2023 <br />• Ramsey Gateway Highway 10 Improvements <br />• Preliminary design in progress <br />• Fully funded (per preliminary cost estimates) <br />Timeframe: <br />Staff estimates up to 15 minutes will be needed for updates and discussion. <br />Observations/Alternatives: <br />NA <br />Funding Source: <br />NA <br />Recommendation: <br />NA <br />Action: <br />No formal action required. For Committee review and discussion purposes only. <br />No file(s) attached. <br />Attachments <br />Form Review <br />Inbox Reviewed By Pate <br />