My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 11/16/2021
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2021
>
Agenda - Public Works Committee - 11/16/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:35:18 AM
Creation date
11/18/2021 9:07:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
11/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• CSAH 116 & TH 47 Intersection Improvements <br />• Construction complete <br />MnDOT Improvement Projects <br />• US 10 / 169 & Ferry Street / TH 47 Interchange <br />• Construction proposed 2022 — 2023 <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />o Preliminary design on hold <br />o MnDOT exploring realignment of Highway 47 to remove S-curve <br />o $45M in bonds authorized October 2020 <br />o Tentatively proposed for construction in 2024 or later <br />• Rum River Bridge Replacement <br />• Construction proposed 2022 — 2023 <br />• Proposing three lanes between Highway 47 and 7th Street <br />Studies & Items of Interest <br />• 5805 148th Lane NW <br />• On -going <br />• FYA Improvements at Sunwood Drive and Ramsey Boulevard <br />• SEH completing Feasibility Analysis <br />• TH 47 Safety Study <br />• Update to be provided by City Engineer Westby <br />• Elk River Highway 10 Study <br />• Update to be provided by City Engineer Westby <br />• Anoka Solution Highway 10 Improvements <br />• Construction proposed 2022 — 2023 <br />• Ramsey Gateway Highway 10 Improvements <br />• Preliminary design in progress <br />• Fully funded (per preliminary cost estimates) <br />Timeframe: <br />Staff estimates up to 15 minutes will be needed for updates and discussion. <br />Observations/Alternatives: <br />NA <br />Funding Source: <br />NA <br />Recommendation: <br />NA <br />Action: <br />No formal action required. For Committee review and discussion purposes only. <br />No file(s) attached. <br />Attachments <br />Form Review <br />Inbox Reviewed By Pate <br />
The URL can be used to link to this page
Your browser does not support the video tag.