My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 11/16/2021
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2021
>
Agenda - Public Works Committee - 11/16/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:35:18 AM
Creation date
11/18/2021 9:07:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
11/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Contractor shall protect adjacent trees and shrubs and notify the City's <br />representative immediately of any damage to trees or pavement associated with <br />the site and work. <br />• Contractor shall remove ALL boardwalk materials that are not completely covered <br />by the new decking (including railing) from the project in conjunction with the <br />Work, and dispose of same properly at his/her expense. <br />• The Contractor shall substantially complete the project by April 30th 2022. <br />• The Contractor shall be paid for the work completed, materials on site, and not <br />equipment & furnishings stored off -site. The City is not responsible for stolen, <br />missing or damaged materials. <br />• Notify the City's representative prior to substantial completion to schedule a final <br />review of the work and make corrections to deficiencies identified in the final <br />review. <br />• This Request for Quotation shall be a not -to -exceed amount. The Contractor must <br />include within his/her quote any time or materials and incidentals necessary to <br />complete the work in a professional and quality manner. At the completion of the <br />Work, the site's grounds shall be returned to its current condition by the <br />Contractor. <br />• There shall be no Change Orders. <br />• Portions of the work site may be required to be enclosed with temporary safety <br />fencing — if the contractor is not physically on site. Fencing is not required if there <br />are no equipment or loose items/tools anywhere on site. However, through - <br />passage for pedestrians shall be maintained at all times. <br />Specification details: <br />• Contractor shall supply and install new 2" x 8" brown treated decking, 8' wide, <br />centered and over and upon, the existing 6' foot boardwalk. This new decking <br />shall be screwed down with #10 X 31/2" Climatek Coated GRK Screws into either <br />the shim board or the existing decking. (Longer screws may be needed in some <br />areas, and considered an incidental.) <br />• Shim as necessary, to place new decking boards level from left to right, using 3/4" <br />thick treated boards, and up to 31/2" thick treated boards, to achieve a level plane <br />within 1" tolerances from left to right within the 8'wide new deck surface. <br />Shimming shall be performed such that there is no 'sagging' or board flexing from <br />movement of people on the completed deck surface. <br />3 I " <br />
The URL can be used to link to this page
Your browser does not support the video tag.