Laserfiche WebLink
Work and Staging Areas: <br />Confine work activities to the boardwalk site, and adjacent to bituminous trails — all <br />of which should remain passable by pedestrians during the construction periods. <br />Contactor is responsible for protecting trail pavement from breaking and damage. <br />No mechanized equipment shall be left overnight on the site (unless fenced), and no <br />construction activity shall be performed before 7 AM nor after 7 PM Monday through <br />Saturday. The contractor shall provide 72-hour advance notice before working on <br />Saturday. City Council approval may be required for Sunday work. <br />Coordinate staging area and fencing with the City's representative prior to beginning <br />the Work as necessary. <br />Liquidated Damages: <br />Liquidated damages may be deducted from the approved quoted amount, in a sum of <br />$50 dollars per weekday (M-F) for non -completion after May 15th, 2022. <br />Warranty/Guarantee: <br />The Contractor warrants and guarantees to the Owner that all installation Work will <br />be of good quality and free from faults or defects in accordance with this RFQ. All <br />defective Work may be rejected. <br />If required by the Owner, prior to payment, the Contractor will promptly without cost <br />to the Owner, correct defective Work, or replace it with non -defective Work. If the <br />Contractor does not correct such defective Work or remove and replace within a <br />reasonable time, the Owner may have the deficiency corrected or the rejected Work <br />removed and replaced. All direct or indirect costs of such correction or removal and <br />replacement, including compensation for additional professional services shall be <br />paid by the Contractor, or deducted by the Owner, all such costs from the quoted <br />contract price. <br />If, instead of requiring correction or removal and replacement of defective Work, the <br />Owner (prior to approval of final payment) prefers to accept it, they may do so. In <br />such case, if the acceptance occurs prior to final payment, a Statement shall be issued <br />incorporating the necessary revisions, including appropriate reductions in Contract <br />Price <br />