My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Council - 10/26/2021
Ramsey
>
Public
>
Minutes
>
Council
>
2021
>
Minutes - Council - 10/26/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:11:08 AM
Creation date
11/29/2021 4:28:44 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Council
Document Date
10/26/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mayor Kuzma aye <br /> <br />Motion carried. <br />7.04: Adopt Resolution #21-305 Ordering Plans and Specifications for Improvement <br />Project #22-05, Riverdale Drive Trunk Utility Improvements, Llama Street to Bowers <br />Drive <br /> <br />City Engineer Westby explained this case is the second part of the case just presented and adopted. <br />He stated the intent of this case is to allow bidding the utility improvements separately from the <br />roadway improvement to speed the construction process to help facilitate Capstone’s construction <br />schedule. <br /> <br />City Engineer Westby stated the estimated project costs are $1,234,000. Bolton and Menke, Inc. <br />has submitted a proposal to prepare plans and specifications with a not-to-exceed fee of $175,205, <br />which is included in the indirect project costs. He noted this is higher than the previous fee because <br />of the addition of a sanitary lift station that is part of this project and takes a lot of associated work <br />and cost. Project costs are proposed with utility enterprise funds which will be paid back with <br />trunk utility fees collected at the time of development. An alternate fee in the amount of $18,865 <br />is included in the proposal to prepare plans and specifications for a watermain loop between the <br />south and north sides of Highway 10 at Puma Street. This loop is included in the City’s <br />Comprehensive Water Supply Plan and is his recommendation to include. <br /> <br />Councilmember Musgrove referenced the lift station and asked if it would only service the <br />Capstone addition or are there other areas it would potentially serve. <br /> <br />City Engineer Westby replied it would serve the broader area, more than Riverstone South. It <br />would also serve the undeveloped farm land and allow them to add land West of there if that land <br />was developed. <br /> <br />Councilmember Musgrove asked if the costs would be brought back to the City through the <br />development cost process. <br /> <br />City Engineer Westby answered, that is correct, through trunk fees that are charged to the <br />developments. <br /> <br />Councilmember Musgrove also asked if the Puma Street estimate would be included. <br /> <br />City Engineer Westby replied it would be good form and appreciated. <br /> <br />Motion by Councilmember Musgrove, seconded by Woestehoff, to Adopt Resolution #21-305 <br />Ordering Plans and Specifications for Improvement Project #22-05, Riverdale Drive Trunk Utility <br />Improvements, Llama Street to Bowers Drive to Include a Watermain Loop Between North and <br />South Sides of Highway 10 in the Area of Puma Street. <br /> <br />A roll call vote was performed: <br />City Council / October 26, 2021 <br />Page 9 of 14 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.