Laserfiche WebLink
PAY ESTIMATE #3 <br /> Ramsay Town Center Phase 2, Segment 1 Improvements <br />Zeolite Street NW, Civic Center Drive NW and Sapphire Street NW <br />Improvement Project No. 05-22 <br /> <br />Contractor <br /> <br />BID SCHEDULE"A"-CONTINUED <br /> <br />:m Used to <br /> Description Estimated Quantity Unit Price Contract Price Date Extension <br /> <br /> 46 EXTRA DEPTH MANHOLE (OVER 8") 48 31 LF $ 100.00 $ 3,100.00 25 $ 2,500,00 <br /> 47 4" CONCRETE WALK 2500 SF $ 3.00 $ 7,500.00 $ <br /> 48 VALLEY GUTTER 780 LF $ 14.00 $ 10,920.00 490 $ 6,860.00 <br /> 49 CONCRETE CURB AND GUTTER DESIGN B618 5700 LF $ 8.00 $ 45,600.00 5883 $ 47,064.00 <br /> 50 CONCRETE CURB AND GUTTER DESIGN B624 132 LF $ 17.00 $ 2,244.00 $ <br /> 51 7" CONCRETE DRIVEWAY PAVEMENT 2450 SF $ 3.90 $ 9,'555.00 1850 $ 7,215.00 <br /> 52 PEDESTRIAN CURB RAMP 2 EACH $ 360.00 $ 720.00 $ <br /> 53 F & I 2" RIGID STEEL CONDUIT 89 LF $ 4.00 $ 356.00 $ <br /> 54 F & I 4" RIGID STEEL CONDUIT 178 LF $ 5.00 $ 890.00 $ <br /> 55 SIGN PANELS TYPE C 30.75 SF $ 28.00 $ 861.00 $ <br /> 56 TRAFFIC CONTROL 1 LS $ 750.00 $ 750.00 1 $ 750.00 <br /> 57 TYPE III BARRICADE 4 EACH $ 245.00 $ 980.00 $ <br /> 58 PAVEMENT MESSAGE {LEFT ARROW) EPOXY . 4 EACH $ 100.00 $ 400.00 $ <br /> 59 F & I SIGN PANEL TYPE"D" 3 F--.ACH $ 275.00 $ 825.00 $ <br /> 60 4" BROKEN LINE YELLOW EPOXY 2645 LF $ 0.01 $ 26.45 $ <br /> 61 4" SOLID LINE WHITE - EPOXY 3045 LF $ 0.50 $ 1,522.50 $ <br /> 6`2 24" STOP LINE WHITE - EPOXY 53 LF $ 5.15 $ 272.95 $ <br /> 6,3 4,, DOUBLE LINE BROKEN & SOLID YELLOW - EPO)~ 515 LF $ 0.50 $ 257.50 $ <br /> 64 24" SOLID LINE WHITE - EPOXY 44 LF $ 5.15 $ 226.60 $ <br /> 65 4" SOLID LINE WHITE - PAINT 2675 LF $ 0.38 $ 1,016.50 $ <br /> 66 4" DOUBLE LINE BROKEN & SOLID YELLOW - PAIN- 515 LF $ 0.38 $ 195.70 $ <br /> 67 INSTALL 4". 6- PVC (SCH40) CONDUIT 600 LF $ 3.00 $ 1,800.00 $ <br /> 68 BALE CHECK 50 EACH $ 10.00 $ 500.00 $ <br /> 69 SILT FENCE TYPE MACHINE SLICED 6000 LF $ 1.65 $ 9,900.00 $ <br /> 70 TEMPORARY CONSTRUCTION ROCK ENTRANCE 2 EACH $ 750.00 $ 1,500.00 $ <br /> 71 SEEDING 2.0 ACRE $ 500.00 $ 1,000.00 $ <br /> 72 SEED MIXTURE 260 200 LB $ 2.20 $ 440.00 $ <br /> 73 MULCH MATERIAL TYPE 3 4 TON $ 145.00 $ 580.00 $ <br /> 74 EROSION CONTROL BLANKETS CATEGORY 3 4000 SY $ 1.70 $ 6,800.00 $ <br /> 75 COMMERCIAL FERTILIZER ANAI.~YSIS 24-2-24 700 LBS $ 0.40 $ 280.00 $ <br /> <br />Total Bid Schedule "A" - Slreet Construction $ 562,023.30 $ 332,976.40 <br /> <br />SUMMARY OF BIDDING <br /> <br />Bid Schedule "A" - Street Construction <br />Base Bid Total <br /> <br />$ 562,023.30 <br /> <br />$ 562,O23.3O <br /> <br />$ 562,023.30 <br /> <br />$ 332,976.40 <br /> <br />$ 332,976.40 <br /> <br />$ 332,976.40 <br />$ 16,648.82 <br />$ 171,141.55 <br />$ 62,878.98 <br />$ 82,307.05 <br /> <br />TOTAL <br /> <br />LESS 5% RETAINAGE <br /> <br />I_ESS PAY ESTIMATE #1 <br />LESS PAY ESTIMATE #2 <br />WE RECOMMEND PAYMENT OF: <br /> <br />APPROVALS: <br />CONTRACTOR: W.B. MILLER, INC. _ <br /> Certification b,~/~'f~tractor: I certify tha~ ~tems and amounts are correct for the work completed to date. <br />Signed: /{,A~/,,'~-I~ ~.~, /~//~ <br />-r~t~e: % ~ o Date -¢ "'/~ -. e % <br /> <br />ENGINEER: HAKANSON ANDERSON ASSOCIATES, INC. <br /> Certification by~n~: We recommenj;Lp~,yment for v~ork a~nd q..uantities as shown. <br /> <br />/'/¢?¢~'(~'/~ "~-- PE- 2 of 2 <br /> <br /> <br />