Laserfiche WebLink
Scheduled Completion: August 19, 2005 <br /> <br />Task 4.0 Conceptual Design <br /> <br />Bolton & Menk, Inc. will complete sufficient preliminary design work to identify a new TH <br />47 corridor alignment that generally follows Dysprosium St and intersects with Bunker <br />Lake Road at Thurston Avenue. The roadway will meet a minimum 45 mph design <br />speed. <br /> <br />Roadway geometry will be established at the intersection to TH 47 and Nowthen Blvd, <br />based on the recommendation in Task 3.0. Preliminary roadway profiles for TH 47 and <br />Nowthen Blvd will be prepared as well as anticipated construction limits. <br /> <br />Deliverables include: A. TH 47 Realignment Conceptual Layout and Profile <br /> B. Recommend Realignment Right-of-Way Needs <br /> C. Preliminary Realignment Construction Limits <br /> <br />Scheduled Completion: September 2, 2005 <br /> <br />N:~MARKETtPROPOSALS\Ramsey, City o~TH 47 Realignment Study\scopeofservices.doc <br /> <br />TH 47 Realignment <br />Conceptual Corridor Planning <br /> <br />Bolton & Menk, Inc. <br /> Scope of Services <br /> Page 2 of 3 <br /> <br /> <br />