Laserfiche WebLink
to this case. Staff is proposing that this cost be paid for out of the EDA Professional Services Fund (9230.6315). <br />Once the Topographical Survey is complete, Bolton and Menk can begin work on the Engineering Services for the <br />West Armstrong Redevelopment Area. The Proposal for Engineering Services (i.e., feasibility, preliminary design, <br />plans and specs) for West Armstrong Redevelopment Area is attached to this case and would need City Council <br />Approval. <br />Staff is asking for action by the EDA on both of these proposals. <br />Notification: <br />Notification is not required. <br />Observations/Alternatives: <br />Observations: <br />The proposal for the Topographic Survey is for $7,955.00. Staff is recommending that the EDA authorize funding <br />this out of its Professional Services (9230-6315. the EDA does not need City Council approval for this expenditure <br />as it is within the the EDA annual approved budget. <br />The proposal for Engineering Services for West Armstrong Redevelopment Area (Design / Plans and Specs and <br />Updated Bunker Lake Blvd Feasibility Study) is $49,835.00. It should be noted that the Topographical Survey <br />referenced in this proposal has been removed and is included in the $7,955.00 Topographical Survey above. In this <br />proposal there is also a proposed Feasibility Report Update at the line item cost of $8,160. Staff has spoken with <br />City Engineer Bruce Westby and this feasibility update could be performed in-house by the City Engineering team <br />if there is available staff capacity. Staff would ask for flexibility from the EDA and a recommendation the the City <br />Council to fund the entire cost of the study (including the Feasibility Report Update) with the ability to reduce it if <br />the work can be done internally. This item cannot be authorized by the EDA and will need City Council approval. <br />Proposal for Engineering Services for West Armstrong Redevelopment Area Topographical Survey - <br />$7,955.00 - <br />Alternatives: <br />1) EDA authorize funding and order report of Engineering Services for West Armstrong Redevelopment Area <br />Topographical Survey as presented ($7,955.00) <br />2) Something else <br />Proposal for Engineering Services for West Armstrong Redevelopment Area (Design/Plans and Specs and <br />Feasibility Update) - $49,835 <br />Alternatives: <br />1) EDA recommend to City Council to Authorize the Funding and Order Engineering Services for West Armstrong <br />Redevelopment Area (Designs/Plans and Feasibility Update) as presented ($49,835)(Staff Recommendation) <br />2) EDA recommend to City Council to Authorize the Funding and Order Engineering Services for West Armstrong <br />Redevelopment Area (Designs/Plans and Specs) excluding the Feasibility Report Update ($41,675) <br />3) Something else <br />Funding Source: <br />Engineering Services for West Armstrong Redevelopment Area Topographical Survey <br />The funding is proposed to come from EDA professional services line item budget 9230-6315. <br />Engineering Services for West Armstrong Redevelopment Area (Designs/Plans and Feasibility Update) <br />The funding for this action would be determined based on consultation with Finance Director and City Council <br />direction. <br />1. PIR Fund <br />2. EDA Fund Balance <br />