My WebLink
|
Help
|
About
|
Sign Out
Home
Ramsey Resident - 2022 - January/February
Ramsey
>
Public
>
Newsletters
>
2022
>
Ramsey Resident - 2022 - January/February
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 9:48:37 AM
Creation date
1/3/2022 1:52:06 PM
Metadata
Fields
Template:
City Clerk
City Clerk Document Type
Newsletter
Document Date
01/01/2022
Document Title
January/February
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ramsey’s Roads: A Plan for Pavement <br />Management and Maintenance <br /> ? e City of Ramsey maintains more than 185 miles of public <br />streets by employing a Pavement Management Program (PMP), <br />which is reviewed and adjusted annually based on updated <br />pavement condition ratings and traffi c volumes, public input, and <br />other select criteria. <br /> ? e primary goal of the PMP is to proactively maintain all <br />pavement sections by performing the proper treatment at the op- <br />timal time to maximize the life of the pavement as cost-eff ectively <br />as practical. If pavement sections are constructed or reconstruct- <br />ed to current design standards and are proactively maintained <br />therea? er, pavement sections will generally last for 60 years before <br />reconstruction is required. However, if pavement sections are not <br />proactively maintained, they will generally require reconstruction <br />a? er 30 years. <br /> Below is a summary of PMP treatments currently performed <br />on City streets with bituminous pavement sections, which comprise over 97-percent of Ramsey’s public streets. <br />• Pavement Rejuvenation – Several miles of public streets annually receive a maltene-based emulsion application, <br />which is absorbed into the pavement surface to keep it ? exible, preventing cracking. ? is treatment is currently <br />being applied to new pavement surfaces within the ? rst three years. However, this schedule may change over <br />time depending on how well it performs. ? is treatment was ? rst applied to City streets in 2020 following the <br />termination of the sealcoat program in 2019. <br />• Crack Seal – Dozens of miles of public streets receive crack seal improvements annually to prevent stormwater <br />runoff from seeping under the pavement. ? is minimizes damage caused by wet subgrade soils, especially during <br />freeze-thaw cycles. Crack seal improvements are typically completed every third, seventh and fourteenth year <br />a? er initial construction, overlays and reconstruction. <br />• Overlay/Mill and Overlay – Several miles of public streets annually receive overlay improvements, which typi- <br />cally involves placing two inches of new pavement on top of existing pavement sections, which may or may not <br />be milled before overlaying the pavement. Overlay improvements are typically completed 20 years following <br />initial construction, a previous overlay and reconstruction. <br />• Reconstruction/Reclamation – Several miles of public streets are annually reconstructed/reclaimed, which gen- <br />erally occurs 30 to 60 years a? er the street is constructed or reconstructed, depending on the existing pavement <br />section and the level to which the pavement was maintained over the years. <br />o Reclamation – ? is process involves reclaiming (recycling) the existing bituminous pavement plus a portion <br />of the underlying aggregate base, then placing and compacting reclaimed material on top of the remaining <br />aggregate base before adding a new pavement section. In general, reclaiming pavement sections is preferred <br />to reconstructing pavement sections since it is signi? cantly less expensive and results in the same life expec- <br />tancy as a reconstructed street. <br />o Reconstruction – ? is process involves removing the entire existing pavement section, curb and gutter if it <br />exists and replacing it using all new materials. <br /> A ? gure showing all PMP projects scheduled for the next 10-years per the currently adopted Capital Improvement <br />Program (CIP) can be viewed at http://www.cityoframsey.com/666/Pavement-Management-Program. As noted earlier, <br />these projects are subject to change based on annual reviews and adjustments to the PMP. <br /> For more information, please contact City Engineer Bruce Westby at 763-433-9825 or email bwestby@cityofram- <br />sey.com. <br />10Ramsey Resident • January/February 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.