My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 01/13/2022
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2022
>
Agenda - Parks and Recreation Commission - 01/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 11:38:37 AM
Creation date
1/10/2022 7:57:56 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
01/13/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Observations and general declarations <br />The Plat is 200.5 acres and if Park Dedication would be satisfied by all land dedication, would equate to 20.05 <br />acres. The Plat is proposed to consist of 270 lots and if Park Dedication would be satisfied solely by cash, it would <br />be in the amount of $3,500 per dwelling unit (the 2021 rate), or $945,000. Trail Fees are $1,000 per dwelling unit <br />(the 2021 rate), or $270,000. <br />The Developer and the City agree that Park Dedication and Trail Fees for the proposed Trott Brook Crossing shall <br />be best satisfied by a combination of land, cash and credit for certain park and trail improvements. This proposed <br />combination and calculation is as follows: <br />Acres of credit eligible land for Park Dedication <br />10.79 acres of fully usable land are proposed to be dedicated for park, and 4.31 acres encumbered by the overhead <br />electric transmission lines and tower are to be credited at 50% or the equivalent of 2.15 acres for a total of 12.95 <br />acres. (The partial land credit, based upon discussion by the Park & Recreation Commission in 2020, referenced <br />above.) <br />12.95 acres satisfy 65% ($614,250) of the Park Dedication due, leaving 35% to be satisfied by a cash contribution <br />($330,750). Staff proposes that the full Park Dedication cash amount in effect at the time of platting be collected on <br />the last 35 lots platted, with the first 175 lots platted considered satisfied. (The alternative and customary manner <br />would be to require 35% of the cash contribution on each lot platted for each phase.) Park fee to be satisfied via <br />cash contribution would be $330,750 (2021 rate). <br />Trail Fees <br />The Developer will be constructing 2,820 of bituminous trail in the appropriate phase of the subdivision, this shall <br />be credited at $25 per lineal foot or $70,500. The Developer will be constructing 160' feet of boardwalk installed on <br />mud pans at $185 per lineal foot, and accordingly $29,600 shall be credited against Trail Fees owed. The <br />Developer shall also be constructing 40' feet of floating boardwalk (bridge) anchored by 4" galvanized spuds at <br />$400 per foot, and accordingly $16,000 shall also be credited against Trail Fees owed. <br />The total of credit against Trail Fees for the bituminous trail and boardwalk is $116,100, leaving 57% of Trail Fees <br />to be satisfied by a cash contribution of the rate at the time of platting each lot. Trail fee to be satisfied via cash <br />contribution would be $153,900 (2021 rate). <br />Observations continued <br />The aforementioned prediction for the need for a 6th community park in this area of north/central Ramsey <br />had much to do with serving the anticipated numbers of new residents and their need for recreation <br />space in this area, north and near Trott Brook. The proposed park with various amenities like the athletic <br />fields, trails, playground, shelter, restroom etc, will fulfill that need. <br />Also over the same decade(s) of envisioning the need for a 6th community park to support more <br />residential growth, Ramsey residents have continually expressed a lament that the community is losing <br />its rural character. The opportunity to 'save' the existing farmstead instead of demolishing the century -old <br />structure's represents a symbolic preservation of Ramsey's past culture or heritage. However, more <br />valuable yet, will be the adaptive reuse of these same wood buildings and barn for public use. The <br />opportunities are many, and align with the communities top refrain (from the 2040 Comprehensive Plan) <br />to 'balance urban growth while preserving our rural character'. The farmstead park may include <br />community gardens, a cooperative style CSA (community supported agriculture), a charming backdrop <br />for photos, and certainly many opportunities for public use of the buildings like the existing farm house for <br />rentals. As a point of reference, Elmcrest Park's building in one month this summer generated $2,400 in <br />rental revenue. The farmstead park, with a renovated barn for large receptions and gatherings would <br />easily quadruple that amount. The farmstead would also lend itself well as the site for a Fall Heritage <br />type festival in addition to weekly Farmer's Market. (For all of the above reasons, staff is proposing using <br />the working name of 'Heritage Farm' as a descriptive, working title for the proposed park.) <br />Upon the Commissions recommendation to City Council on the Park Dedication for Trott Brook <br />
The URL can be used to link to this page
Your browser does not support the video tag.