My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 01/13/2022
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2022
>
Agenda - Parks and Recreation Commission - 01/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 11:38:37 AM
Creation date
1/10/2022 7:57:56 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
01/13/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parks & Assistant Public Works Superintendent Riverblood replied that would be difficult to <br />determine conclusively, because it cannot be certain when and how properties will develop. He <br />stated that estimates could be done based on the current zoning or projection growth. <br />Acting Chair Sis stated that the fee structure has to be based on reality and need and therefore he <br />wondered whether there is a metric that would establish such a need. <br />Parks & Assistant Public Works Superintendent Riverblood replied that the need is the CIP. He <br />stated that plan also includes a community center which is often a public/private partnership. He <br />provided details on the interfund loan that was used to purchase properties within The COR. He <br />stated that land sales are currently paying back that loan, but once that is paid off, staff would <br />propose to use a majority of the land sales within The COR used for construction of Municipal <br />Plaza and The Waterfront. He noted that another option would be to perhaps gain additional <br />funding through referendum to support community desires, such as a community center to include <br />other park needs. <br />Councilmember Musgrove asked if the Park Trust Funds must be used for new development. <br />Parks & Assistant Public Works Superintendent Riverblood replied that it is legal for the City to <br />impose development fees, as every home permitted places new need on City infrastructure and <br />facilities. He noted that some developments are already near larger city parks that meet that need. <br />He explained that there needs to be a nexus between Park Dedication fees collected and how the <br />funds are used. He stated that the trail system helps to provide that geographical connection to <br />existing park features. He stated that the nexus is more important in The COR because of the <br />density and need for additional outside space for apartment residents. He stated that when a city <br />does not do a good job allocating park dedication dollars, there can be liability from developers <br />that may take the city to court. He stated that the previous year they reviewed the 2021 and 2022 <br />projects, which had a very good geographic distribution. <br />Commissioner Leistico asked if the City has the funding and projects identified but is lacking the <br />manpower or labor to implement the projects. She noted that some of these projects are not that <br />large in scale of funding but have remained on the list for years. <br />Parks & Assistant Public Works Superintendent Riverblood replied that people and funding is <br />required for projects. He noted that the boardwalk project required a certain amount of time and <br />energy to develop the plans and specifications along with the time needed to go through the proper <br />Commissions for review. He stated that even when a contract is brought on for the project, staff <br />still has oversight of the project and there needs to be ongoing maintenance. He noted that the <br />Commission would probably be suprised to hear the amount of maintenance that is required for <br />the dog park. He estimated that 30,000 dog waste bags are used throughout the city as an example. <br />He stated that the larger the park and trail system grows, the more time and energy is needed for <br />maintenance, therefore it is a balancing act. <br />Acting Chair Sis stated that the additional information that was requested has been provided, and <br />asked the Commission on input on the direction it would like to take. <br />Park and Recreation Commission/November 18, 2021 <br />Page 7 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.