Laserfiche WebLink
· l';mcrgcncy Apparatus completed annual maintenance. <br /> <br />· Tanker Itl bad new brakes installed and Engine #1 needs brakes. The City Mechanic will <br /> peri'oma the work on Engine #1. <br /> <br />· '['wo 2 ½ inch nozzles were ordered for Engine #2. <br /> <br />· 'I'hc (h'ass Rigs are in service. <br /> <br />· Tanker #2 had a butterfly valve installed. <br /> Nozzles are inventoried and stamped. <br /> 150 l~et of bose was tested and is hanging. <br /> <br />· I[' there is a power outage at Station #1 the doors will work with the power on/off switch. At <br /> Station #2 there is a lock box at the kitchen door with the same code as the entry door. The <br /> garage doors at Station #1 have a manual release, at Station #2 pull and hold the chain as you <br /> Ii fi. Make sure doors are opened wide enough for the tracks to get out. There is no back up <br /> power tbr thc base radios. <br /> <br />· Running boards have been installed on Rescue #2. <br /> <br />R /I I ) IOS/ P A G E RS/SCBA <br /> <br />()flicer Strcicb reviewed the Radios/Pagers/SCBA Report. <br /> <br />· ~l'herc arc two spare pagers. Non-working pagers will be replaced rather than repaired. <br /> Batteries arc available. <br /> <br />· Two hand held radios are charged and ready for use. <br /> <br />· Rci]cctivc fiat stickers were ordered for the pagers. <br /> <br />· ~l'herc is a full supply of water. <br /> <br />· llrcadboards are operational. <br /> <br />7 77RNO {/7' GE,4 R/MA PS <br /> <br />()I'fi ocr I~cmm reviewed the Turnout Gear Report. <br /> <br />· l:irelighter I)ablberg's turnout gear pockets are being retrofitted. <br /> <br /> FIRE DEPARTMENT/MARCH 13, 2002 <br /> Page 2 of 6 <br /> <br /> <br />