Laserfiche WebLink
· At the next relief meeting discussion will take place on required events. <br /> <br /> MONTIILY REPORTS <br /> <br />A,%'/,~,'7 ;4 NT' C/lIEF 'S <br /> <br />· State reports are completed and up to date, which makes the Department compliant for the <br /> FP;MA grant. <br /> <br />· ()flice to bay door is broken in Station #2. A doorstop needs to be purchased for it. <br /> <br />· A second dumpster is needed at Station #2. <br /> <br />· Ofl~ccrs discussed a storage building to put such items as the SCBA trailer, boat and grill. <br /> There might be enough brick left from Station #2 to use for one or two sides of it. Size and <br /> location requirements will have to be looked into. <br /> <br />· l'aymcnt was made for the T-1 line to be installed at Station #2. <br /> <br />( MI'TAJN #11 <br /> <br />· Rescue #2 switch for the compartment light was repaired. <br /> <br />· Rear beacon on Tanker #2 is broken, two were ordered. <br /> <br />· Foaln system on Engine # 1 not working, it is possibly the flow meter. <br /> <br />· Tanker #1 foam system will be removed and used for parts. <br /> <br />· Trucks need atouch up. <br /> <br />· Station #1 tarps need to be put away. <br /> <br />( ~ll'TA/N #12 <br /> <br />· Firefighter McKusick's turnout gear was sent in for repair, however the repairs were not <br /> completed. Firefighter Lecy received a pair of gloves. <br /> <br />· Turnout gear was to be cleaned by September 9th. <br />· Fircfighters Amundson, Block, Gordon and Vansteenbergen are due for pictures. <br />· Maps are ready to be picked up at the County. <br />· Pieces of bad hose have been replaced. <br /> FIRE DEPARTMENT OFFICERS/SEPTEMBER 12~ 2002 <br /> Page 3 of 6 <br /> <br /> <br />