Laserfiche WebLink
RA DIO,%/PA GERS <br /> <br />· Fircfighters have their digital pagers and are they working with the exception of a couple <br /> which were sent back. <br /> <br />SCBA equipment checked out ok. Equipment will not be repaired as parts are not available. <br />Some of the older equipment will be kept for training in the SCBA trailer. New equipment <br />has been ordered and will be delivered in April. <br /> <br />· Fircfighter Bergerson's maskwas repaired. <br /> <br />· Filter at Station//2 was changed. <br /> <br />· Thc l)epartment needs to look at mobile cascade systems and trailers which will be ordered <br /> with FEMA grant funds. The same compressor manufacturer will be used. <br /> <br />Bids will be received on new high pressure system for Station #1. <br /> <br />7 'UR NO UT GEA R/MA PS <br /> <br />· I:ircfighter Block's turnout gear is being refitted. <br /> <br />· Assistant Chief Lemm was fitted for his white uniform. <br /> <br />· Fircfighter Fossum's pants were rechecked and are fitted correctly. <br /> <br />· (ffficcr Lewandowski is checking on the suspender order. <br /> <br />New firefighter pictures will be taken internally as long as the background matches the <br />cxi st ing pictures, otherwise Officer Lewandowski has found a less expensive photographer <br />who would have the same background. <br /> <br />· Ol~ficcr Lewandowski will look into the cost of getting badges numbered in sequential order. <br /> lhtdgc numbers would then be retired with the firefighters. <br /> <br />MEDICAL/,q'MALL TOOLS <br /> <br />· No medical reports were filled out this month. <br /> <br />A back pack has been ordered. Once received the 02 kit will be taken from Rescue #1 and <br />put in Engine #1. <br /> <br />FIRE DEPARTMENT OFFICERS/MARCH 2, 2003 <br /> Page 5 of 6 <br /> <br /> <br />