Laserfiche WebLink
above its optimum moisture content. The upper 3 feet of fill and backfill should be compacted to <br />a minimum of 100 percent of its standard Proctor maximum dry density. <br />Full Depth Reclamation For "Full Depth Reclamation" areas there may be instances where the <br />recommended aggregate base thickness exceeds the existing aggregate base thickness. The <br />preferred method of pavement repair would be to reclaim the existing bituminous, subcut the <br />subgrade, replace the reclaim and add additional aggregate base as needed then construct the <br />bituminous pavement. Subcutting the subgrade may not be feasible or cost effective. As an <br />alternate it may be possible to use a thicker bituminous pavement along with the existing <br />aggregate base or possibly subcutting some of the exiting aggregate base. Using MN/DOT <br />granular equivalencies, one (1) inch of bituminous is equivalent to 2.25 inches of MN/DOT <br />aggregate base. <br />R-Values Laboratory tests to determine the soils Hveem Stabilometer R-Value (R-Value) was <br />beyond the scope of this project. Information provided in the State of Minnesota Department of <br />Transportation, Geotechnical & Pavement Manual, Part II, indicates that R-Values for granular <br />materials meeting the ASTM Classification SM, SP-SM and/or SP can range from 30 to 70. In areas <br />where the subgrade soils consist of silty sand (SM) it is our opinion that an R-Value of 30 can be <br />used for pavement design. In areas where the subgrade soils consist of poorly graded sand (SP) <br />or poorly graded sand with silt (SP-SM) it is our opinion that an R-Value of 50 can be used for <br />pavement design. <br />Recommended Pavement Section Thickness <br />It should be noted that the pavement sections presented below are not absolutes. Depending on <br />serviceability expectations, material availability, and cost, there could be circumstances under <br />which alternative sections will be more practicable. <br />Subgrade R-Value of 30 Based on an estimated R-value of 30 and a maximum of 50,000 ESAL's <br />we recommend a pavement section consisting of a minimum of 4 inches of bituminous underlain <br />by a minimum of 9 inches of Class 5 aggregate base. <br />Subgrade R-Value of 50 Based on an estimated R-value of 50 and a maximum of 50,000 ESAL's <br />we recommend a pavement section consisting of a minimum of 4 inches of bituminous underlain <br />by a minimum of 6 inches of Class 5 aggregate base. <br />4.4 Materials <br />We recommend aggregate base meeting MN/DOT specification 3138 for Class 5 aggregate base. <br />We recommend the aggregate base be compacted to 100 percent of its maximum standard Proctor <br />dry density. <br />We recommend that the bituminous wear and base courses meet the requirement of MN/DOT <br />specification 2360. We recommend the bituminous pavements be compacted to at least 92% of the <br />maximum theoretical density. <br />Pavement reconstruction could include installing concrete curb and gutter. We recommend <br />specifying concrete that has a minimum 28-day compressive strength of 4,000 psi. We recommend <br />specifying 5 to 8 percent entrained air for exposed concrete to provide resistance to freeze -thaw <br />11 <br />